Using the FDH formulation of DEA to evaluate a multi-criteria problem in parallel machine scheduling

被引:0
作者
Ruiz-Torres, AJ [1 ]
López, FJ
机构
[1] Polytech Univ Puerto Rico, Dept Ind Engn, Coll Engn, San Juan, PR 00919 USA
[2] Univ Texas, Dept Informat & Decis Sci, Coll Business Adm, El Paso, TX 79968 USA
关键词
free disposal hull; data envelopment analysis; heuristics;
D O I
10.1016/j.cie.2004.06.002
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
We consider the problem of scheduling jobs on parallel machines when there are two criteria to optimize, namely, minimizing both the makespan and the number of tardy jobs. We propose four heuristics to find solutions to this problem, which we evaluate and compare using the Free Disposal Hull (FDH) formulation of Data Envelopment Analysis (DEA). Our approach illustrates how DEA can be used to compare the performance of heuristics in a multi-criteria environment. We also analyze the impact that some scheduling elements, like the number of machines, the ratio jobs/machines, the congestion, etc. have on the heuristics. (C) 2004 Elsevier Ltd. All rights reserved.
引用
收藏
页码:107 / 121
页数:15
相关论文
共 16 条
[1]  
[Anonymous], 1978, EUR J OPER RES
[2]   SOME MODELS FOR ESTIMATING TECHNICAL AND SCALE INEFFICIENCIES IN DATA ENVELOPMENT ANALYSIS [J].
BANKER, RD ;
CHARNES, A ;
COOPER, WW .
MANAGEMENT SCIENCE, 1984, 30 (09) :1078-1092
[3]  
COFFMAN EG, 1978, SIAM J COMPUT, V7, P1, DOI 10.1137/0207001
[4]  
Deprins D, 1984, MEASURING LABOR EFFI
[5]   A SIMULATED ANNEALING HEURISTIC FOR SCHEDULING IN A FLOWSHOP WITH BICRITERIA [J].
GANGADHARAN, R ;
RAJENDRAN, C .
COMPUTERS & INDUSTRIAL ENGINEERING, 1994, 27 (1-4) :473-476
[6]   BOUNDS ON MULTIPROCESSING TIMING ANOMALIES [J].
GRAHAM, RL .
SIAM JOURNAL ON APPLIED MATHEMATICS, 1969, 17 (02) :416-&
[7]   MINIMIZING THE NUMBER OF TARDY JOBS FOR M-PARALLEL MACHINES [J].
HO, JC ;
CHANG, YL .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1995, 84 (02) :343-355
[8]  
HO JC, 1991, NAV RES LOG, V38, P367, DOI 10.1002/1520-6750(199106)38:3<367::AID-NAV3220380307>3.0.CO
[9]  
2-I
[10]   SIMULATED ANNEALING FOR RESOURCE-CONSTRAINED SCHEDULING [J].
JEFFCOAT, DE ;
BULFIN, RL .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1993, 70 (01) :43-51