Simulation modeling and analysis of tool sharing and part scheduling decisions in single-stage multimachine flexible manufacturing systems

被引:18
作者
Kumar N, Suresh
Sridharan, R. [1 ]
机构
[1] Natl Inst Technol, Dept Mech Engn, Calicut 673601, Kerala, India
[2] Coll Engn, Dept Mech Engn, Adoor 691551, Kerala, India
关键词
flexible manufacturing system; tool sharing; simulation; scheduling; LOADING PROBLEMS; FMS; SELECTION; ALLOCATION; OPERATION; MANAGEMENT;
D O I
10.1016/j.rcim.2006.02.013
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper focuses on a simulation-based study of tool sharing problem in single-stage multimachine Flexible Manufacturing Systems. Three different scenarios are considered for investigation. A simulation model has been developed for each of these scenarios. A number of scheduling rules are incorporated in the simulation models for the decisions such as tool request selection and part launching in the context of tool sharing environment. The performance measures evaluated are mean tardiness, conditional mean tardiness and mean flow time. Based on the analysis of the simulation results, the best possible scheduling rule combinations for part launching and tool request selection have been identified for the three scenarios. (c) 2006 Elsevier Ltd. All rights reserved.
引用
收藏
页码:361 / 370
页数:10
相关论文
共 28 条
[1]  
[Anonymous], ANN OPER RES
[2]   A BRANCH AND BOUND APPROACH FOR MACHINE LOAD BALANCING IN FLEXIBLE MANUFACTURING SYSTEMS [J].
BERRADA, M ;
STECKE, KE .
MANAGEMENT SCIENCE, 1986, 32 (10) :1316-1335
[3]   Tool allocation in flexible manufacturing systems with tool alternatives [J].
Buyurgan, N ;
Saygin, C ;
Kilic, SE .
ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2004, 20 (04) :341-349
[4]   AUTOMATED TOOL MANAGEMENT IN FLEXIBLE MANUFACTURING [J].
ELMARAGHY, HA .
JOURNAL OF MANUFACTURING SYSTEMS, 1985, 4 (01) :1-13
[5]   Heuristic procedures for the parallel machine problem with tool switches [J].
Fathi, Y ;
Barnette, KW .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2002, 40 (01) :151-164
[6]   TOOL SHARING IN AN FMS - A FEASIBILITY STUDY [J].
GAALMAN, GJ ;
NAWIJN, WM ;
PLATZER, LW .
ENGINEERING COSTS AND PRODUCTION ECONOMICS, 1987, 12 (1-4) :107-115
[7]   High performance loading robot design for a tool-delivery system [J].
Gougar, H ;
Cho, S ;
Prabhu, V .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2002, 40 (14) :3401-3424
[8]   A SYNTHESIS OF DECISION-MODELS FOR TOOL MANAGEMENT IN AUTOMATED MANUFACTURING [J].
GRAY, AE ;
SEIDMANN, A ;
STECKE, KE .
MANAGEMENT SCIENCE, 1993, 39 (05) :549-567
[9]   PERFORMANCE ANALYSIS OF A LIM-BASED HIGH-SPEED TOOL DELIVERY SYSTEM FOR MACHINING [J].
HAHN, HS ;
SANDERS, JL .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1994, 32 (01) :179-207
[10]   REAL-TIME TOOL CONTROL AND JOB DISPATCHING IN FLEXIBLE MANUFACTURING SYSTEMS [J].
HAN, MH ;
NA, YK ;
HOGG, GL .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1989, 27 (08) :1257-1267