Study of the Abrasion and Transfiguration of the Cyclone Separator's Exhaust in a 300MW CFB Boiler

被引:0
|
作者
Chen Jihui [1 ]
机构
[1] CISDI Engn Co Ltd, Dept Power, Chongqing, Peoples R China
来源
ICEET: 2009 INTERNATIONAL CONFERENCE ON ENERGY AND ENVIRONMENT TECHNOLOGY, VOL 1, PROCEEDINGS | 2009年
关键词
CFB; cyclone separator; exhaust; numerical simulation; abrasion; transfiguration;
D O I
10.1109/ICEET.2009.205
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Numerical simulation of the flow field and pressure field on the cyclone separator's exhaust of a 300MW CFB boiler is carried out in this study. The results indicate that the distribution of the flue gas velocity in the exhaust is asymmetric. The velocity is larger in the lower region than that of the upper region. Due to the influence of the contraction and the off-set of the exhaust, the maximum velocity is nearby the contracted zone. Besides, the pressure difference between the inner surface and the outer surface is the main source of the force on the surface of the exhaust. The axial distributions and circumferential distributions of the pressure difference are all asymmetric. The velocity is smaller in the upper region than that of the lower region, and the maximum is nearby the contracted zone of the exhaust. Furthermore, several ways are proposed for defending the abrasion and transfiguration of the cyclone separator's exhaust in CFB boilers.
引用
收藏
页码:829 / 832
页数:4
相关论文
共 50 条
  • [1] Practice of Deep Desulphurization in a 300MW CFB Boiler
    Zeng Tinghua
    Zhan Zhigang
    Fang Jian
    Liu Yi
    PROCEEDINGS OF THE ASME POWER CONFERENCE - 2011, VOL 1, 2012, : 197 - +
  • [2] The Optimization to Control System of Desulfurization in Furnace of 300MW CFB Boiler
    Kong, Xiangjie
    Bai, Jianyun
    Liu, Lihong
    ADVANCES IN POWER AND ELECTRICAL ENGINEERING, PTS 1 AND 2, 2013, 614-615 : 1509 - 1513
  • [3] Model Study on SO2 Generation and Control of 300MW CFB Boiler
    Li S.
    Ma S.
    Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering, 2021, 41 (17): : 5966 - 5972
  • [4] Numerical Simulation for a CFB Boiler's Cyclone Separator with Structure Optimizations
    Guo, Q.
    Wang, Q. H.
    Lu, X. F.
    Ji, P. Y.
    Kang, Y. H.
    CLEAN COAL TECHNOLOGY AND SUSTAINABLE DEVELOPMENT, 2016, : 257 - 263
  • [5] THE ANALYSIS AND SOLUTION OF PSH OVERHEATING IN 300MW CFB BOILER FOR BAOLIHUA PROJECT
    Peng, Lei
    Nie, Li
    Hu, Xiukui
    Tan, Bin
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON POWER ENGINEERING 2009 (ICOPE-09), VOL 3, 2009, : 305 - 307
  • [6] Analysis on "against the wind" of primary air fan in 300MW CFB boiler
    Xiao, Guanhua
    Yan, Xi
    FOURTH INTERNATIONAL CONFERENCE ON ENERGY ENGINEERING AND ENVIRONMENTAL PROTECTION, 2020, 467
  • [7] Study and Design of Platen Superheater of 300 MW CFB Boiler
    Zhang Man
    Lv Qinggang
    Jiang Xiaoguo
    Sun Yunkai
    CLEANER COMBUSTION AND SUSTAINABLE WORLD, 2012, : 419 - 422
  • [8] 300MW CFB锅炉深度脱硫
    范跃伟
    云南电力技术, 2014, 42(S1) (S1) : 8 - 10
  • [9] 300MW CFB锅炉故障处理
    魏志全
    四川电力技术, 2007, (01) : 63 - 66
  • [10] Application of Fluidization Reconstruction Energy-Saving Combustion Technology on 300MW CFB boiler
    Su Jianmin
    Hu Nan
    ELECTRICAL POWER & ENERGY SYSTEMS, PTS 1 AND 2, 2012, 516-517 : 140 - +