First-passage time criteria for the operation of reservoirs

被引:2
作者
Fisher, Aiden J. [1 ]
Green, David A. [1 ]
Metcalfe, Andrew V. [1 ]
Akande, Kunle [2 ]
机构
[1] Univ Adelaide, Sch Math Sci, Adelaide, SA 5005, Australia
[2] CH2MHILL, Swindon SN4 0QD, Wilts, England
基金
澳大利亚研究理事会;
关键词
Multi-objective optimisation; Pareto-front; First-passage time criterion; Phase-type distribution; OPTIMIZATION; MANAGEMENT; SYSTEMS; SDP;
D O I
10.1016/j.jhydrol.2014.09.061
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
A multi-objective optimisation for reservoir operation based on expected monetary value and expected first passage-time criterion is proposed. The computations are facilitated by the algorithms of matrix analytic methods. The formal structure, classifying states as levels and phases within levels, and associated algorithms of matrix analytic methods are introduced in the context of multi-reservoir systems. The algorithms underpin the feasibility of the computations for large systems and enable the calculation of the full distribution of first passage time. A new algorithm for computing results for a seasonal model, which reduces computing time by an order of magnitude for monthly time steps is presented. The methods are illustrated for a two reservoir system, with an option of pumping additional water from a transfer scheme, in the East of England. The Pareto front of Pareto optimal policies is shown. (C) 2014 Elsevier B.V. All rights reserved.
引用
收藏
页码:1836 / 1847
页数:12
相关论文
共 50 条
[41]   Structural design optimization under stochastic excitations considering first-passage probability constraint based on dimension-reduced probability density evolution equation [J].
Yang, Jia-Shu ;
Lyu, Meng-Ze ;
Chen, Jian-Bing ;
Xue, Jian-Yang .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 2025, 264
[42]   RISK-BASED PERFORMANCE CRITERIA FOR REAL-TIME RESERVOIR OPERATION [J].
BURN, DH ;
VENEMA, HD ;
SIMONOVIC, SP .
CANADIAN JOURNAL OF CIVIL ENGINEERING, 1991, 18 (01) :36-42
[43]   A Two-Stage Stochastic Optimization for Robust Operation of Multipurpose Reservoirs [J].
Ortiz-Partida, J. Pablo ;
Kahil, Taher ;
Ermolieva, Tatiana ;
Ermoliev, Yuri ;
Lane, Belize ;
Sandoval-Solis, Samuel ;
Wada, Yoshihide .
WATER RESOURCES MANAGEMENT, 2019, 33 (11) :3815-3830
[44]   Optimizing Hydropower Reservoirs Operation via an Orthogonal Progressive Optimality Algorithm [J].
Feng, Zhong-kai ;
Niu, Wen-jing ;
Cheng, Chun-tian ;
Lund, Jay R. .
JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2018, 144 (03)
[45]   Quarter-Hourly Operation of Hydropower Reservoirs with Pumped Storage Plants [J].
Wang, Jinwen ;
Liu, Shuangquan .
JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT-ASCE, 2012, 138 (01) :13-23
[46]   A Triple-stage Operation Method for Deriving Operation Rules for Cascade Reservoirs during Catastrophic Flood Events [J].
Zhu, Di ;
Chen, Hua ;
Zhou, Yanlai ;
Mei, Yadong ;
Xu, Xinfa ;
Guo, Shenglian .
WATER RESOURCES MANAGEMENT, 2022, 36 (13) :4863-4883
[47]   Optimal switching time control of petroleum reservoirs [J].
Hasan, Agus ;
Foss, Bjarne .
JOURNAL OF PETROLEUM SCIENCE AND ENGINEERING, 2015, 131 :131-137
[48]   Contrastive analysis of three parallel modes in multi-dimensional dynamic programming and its application in cascade reservoirs operation [J].
Zhang, Yanke ;
Jiang, Zhiqiang ;
Ji, Changming ;
Sun, Ping .
JOURNAL OF HYDROLOGY, 2015, 529 :22-34
[49]   China' energy-water nexus: Hydropower generation potential of joint operation of the Three Gorges and Qingjiang cascade reservoirs [J].
Shang, Yizi ;
Lu, Shibao ;
Ye, Yuntao ;
Liu, Ronghua ;
Shang, Ling ;
Liu, Chunna ;
Meng, Xianyong ;
Li, Xiaofei ;
Fan, Qixiang .
ENERGY, 2018, 142 :14-32
[50]   Short-Term Optimal Operation of Hydropower Reservoirs with Unit Commitment and Navigation [J].
Wang, Jinwen ;
Zhang, Yongchuan .
JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT-ASCE, 2012, 138 (01) :3-12