Minimizing total weighted tardiness on a single batch process machine with incompatible job families

被引:64
作者
Perez, IC [1 ]
Fowler, JW [1 ]
Carlyle, WM [1 ]
机构
[1] Arizona State Univ, Tempe, AZ 85287 USA
基金
美国国家科学基金会;
关键词
D O I
10.1016/S0305-0548(03)00239-9
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The diffusion step in semiconductor wafer fabrication is very time consuming, compared to other steps in the process, and performance in this area has a significant impact on overall factory performance. Diffusion furnaces are able to process multiple lots of similar wafers at a time, and are therefore appropriately modeled as batch processing machines with incompatible job families. Due to the importance of on-time delivery in semiconductor manufacturing, we focus on minimizing the total weighted tardiness in this environment. The resulting problem is NP-Hard, and we decompose it into two sequential decision problems: assigning lots to batches followed by sequencing the batches. We develop several heuristics for these subproblems and test their performance. (C) 2003 Elsevier Ltd. All rights reserved.
引用
收藏
页码:327 / 341
页数:15
相关论文
共 30 条
[1]  
AHMADI JH, 1992, OPER RES, V39, P750
[2]  
BAUDET T, 1995, COMPUT CHEM ENG, V19, P633
[3]   DOMINANCE AND DECOMPOSITION HEURISTICS FOR SINGLE-MACHINE SCHEDULING [J].
CHAMBERS, RJ ;
CARRAWAY, RL ;
LOWE, TJ ;
MORIN, TL .
OPERATIONS RESEARCH, 1991, 39 (04) :639-647
[4]   MINIMIZING TOTAL COMPLETION-TIME ON A BATCH PROCESSING MACHINE WITH JOB FAMILIES [J].
CHANDRU, V ;
LEE, CY ;
UZSOY, R .
OPERATIONS RESEARCH LETTERS, 1993, 13 (02) :61-65
[5]   MINIMIZING TOTAL COMPLETION-TIME ON BATCH PROCESSING MACHINES [J].
CHANDRU, V ;
LEE, CY ;
UZSOY, R .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1993, 31 (09) :2097-2121
[6]   Towards a knowledge-based scheduling system for semiconductor testing [J].
De, S ;
Lee, A .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1998, 36 (04) :1045-1073
[7]   The batch loading and scheduling problem [J].
Dobson, G ;
Nambimadom, RS .
OPERATIONS RESEARCH, 2001, 49 (01) :52-65
[8]   Stochastic scheduling of a batch processing machine with incompatible job families [J].
Duenyas, I ;
Neale, JJ .
ANNALS OF OPERATIONS RESEARCH, 1997, 70 :191-220
[9]   Heuristic scheduling of jobs on a multi-product batch processing machine [J].
Fanti, MP ;
Maione, B ;
Piscitelli, G ;
Turchiano, B .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1996, 34 (08) :2163-2186
[10]  
Ghazvini FJ, 1998, INT J PROD ECON, V55, P273, DOI 10.1016/S0925-5273(98)00067-X