Use of jet grouting to limit diaphragm wall displacement of a deep excavation

被引:50
作者
Hsieh, HS [1 ]
Wang, CC
Ou, CY
机构
[1] Trin Engn Consultants, Taipei, Taiwan
[2] Cheng Shiu Inst Technol, Dept Civil Engn, Kaohsiung, Taiwan
[3] Natl Taiwan Univ Sci & Technol, Dept Construct Engn, Taipei, Taiwan
关键词
jet grouting; diaphragm wall; excavation; soil settlement; numerical analysis; displacement;
D O I
10.1061/(ASCE)1090-0241(2003)129:2(146)
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
Excessive lateral diaphragm wall displacement and the associated ground settlement are often the primary cause of damage of nearby buildings. It is therefore imperative to minimize diaphragm wall displacement during basement excavation if the integrity of adjacent buildings is of concern. This paper describes the application of a jet grouting scheme to reduce the diaphragm wall displacement of a six-level basement excavation. Based upon field experience of similar projects, buildings adjacent to the construction site may settle well beyond an acceptable limit if excavation is carried out without any protection measures being taken. In this excavation project, the soil mass within the excavation zone was partially jet grouted in an attempt to increase its passive resistance as an effective measure to limit wall displacement. Numerical analyses were carried out to assess the effects of jet grouting. Field measurements on wall displacement and ground settlement confirm the effectiveness of the improvement scheme.
引用
收藏
页码:146 / 157
页数:12
相关论文
共 15 条
[1]  
Aboshi H, 1979, PROC INT C SOIL REIN, P211
[2]  
Bowles JE., 1997, Foundation Analysis and Design, VFifth
[3]  
CLOUGH GW, 1990, GEOTECH SP, V25, P439
[4]  
Fang H., 2013, FDN ENG HDB
[5]  
*FLAC, 1993, FLAC VERS 3 2 US MAN
[6]  
GOUGHNOUR RR, 1990, ASTM
[7]  
HSIEH HS, 1995, P 10 AS REG C SOIL M, P403
[8]  
HSIEH HS, 1991, P 1 YOUNG AS GEOT EN, P41
[9]  
HUNT SW, 1997, P RAP EXC TUNN C, P379
[10]  
Mesri G, 1996, SOIL MECH ENG PRACTI, DOI DOI 10.1097/00010694-194911000-00029