共 13 条
[1]
APPLYING NEW SCHEDULING THEORY TO STATIC PRIORITY PREEMPTIVE SCHEDULING
[J].
SOFTWARE ENGINEERING JOURNAL,
1993, 8 (05)
:284-292
[2]
AUDSLEY N, 1993, P 5 EUR WORKSH REAL, P36
[3]
BALARIN F, 1997, P 34 ACM IEEE DES AU, P568
[5]
Bhattacharyya S.S., 1996, Software Synthesis from Data~ow Graphs
[6]
BUCK J, 1994, INT J COMPUTER SIMUL, V4
[7]
RANGE-CHART-GUIDED ITERATIVE DATA-FLOW GRAPH SCHEDULING
[J].
IEEE TRANSACTIONS ON CIRCUITS AND SYSTEMS I-FUNDAMENTAL THEORY AND APPLICATIONS,
1992, 39 (05)
:351-364
[8]
Halbwachs N., 1993, Synchronous Programming of Reactive Systems
[9]
LIAO G, 1994, P 27 HAW INT C SYST, V1, P68