Integrated methodology for board assignment and component allocation in printed circuit board assembly

被引:10
作者
Neammanee, P
Randhawa, SU [1 ]
机构
[1] Oregon State Univ, Corvallis, OR 97331 USA
[2] NIDA, Sch Appl Stat, Bangkok 10240, Thailand
关键词
D O I
10.1080/0020754021000036938
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
An approach to minimize makespan for assigning boards to production lines is described. Because of sequence-dependent set-up times, board assignment and component allocation have to be performed concurrently. An integrated methodology is developed to obtain a solution to these two problems. The methodology consists of seven phases: printed circuit board grouping, family decomposition, subfamily sequencing, Keep Tool Needed Soonest (KTNS) procedure, component set-up determination, component allocation and board assignment. Application of the methodology to industrial problems demonstrates that it can solve large-scale problems efficiently. In addition, the effect of two key parameters, feeder capacity and threshold value, on the performance of the solution procedure was examined. The results indicate that feeder capacity has an impact on total workload imbalance but not on the global makespan. Threshold value, a measure of effectiveness of joining a component type to a component group for a printed circuit board family, has a significant effect on the global makespan. The interactions of threshold value, and variations in printed circuit board requirement and component usage also affect global makespan.
引用
收藏
页码:919 / 937
页数:19
相关论文
共 23 条
[1]   Component allocation to balance workload in printed circuit card assembly systems [J].
Ammons, JC ;
Carlyle, M ;
Cranmer, L ;
DePuy, G ;
Ellis, K ;
McGinnis, LF ;
Tovey, CA ;
Xu, H .
IIE TRANSACTIONS, 1997, 29 (04) :265-275
[2]  
ASKIN RG, 1994, NAV RES LOG, V41, P587, DOI 10.1002/1520-6750(199408)41:5<587::AID-NAV3220410502>3.0.CO
[3]  
2-Q
[4]   PART ASSIGNMENT TO ELECTRONIC INSERTION MACHINES - 2 MACHINE CASE [J].
BENARIEH, D ;
DROR, M .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1990, 28 (07) :1317-1327
[5]  
CAPPS CH, 1997, THESIS OREGON STATE
[6]   Grouping components in printed circuit board assembly with limited component staging capacity and single card setup: Problem characteristics and solution procedures [J].
Daskin, MS ;
Maimon, O ;
Shtub, A ;
Braha, D .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1997, 35 (06) :1617-1638
[7]  
DEPUY GW, 1995, THESIS GEORGIA I TEC
[8]   Production scheduling in SMT electronic boards assembly [J].
Garetti, M ;
Pozzetti, A ;
Tavecchio, R .
PRODUCTION PLANNING & CONTROL, 1996, 7 (02) :197-204
[9]   Component allocation and job sequencing for two series-connected SMD placement machines [J].
Gronalt, M ;
Zeller, R .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2000, 38 (02) :409-427
[10]   PCB ASSEMBLY SETUP REDUCTION USING GROUP TECHNOLOGY [J].
HASHIBA, S ;
CHANG, TC .
COMPUTERS & INDUSTRIAL ENGINEERING, 1991, 21 (1-4) :453-457