共 7 条
[1]
DAEMRICH K, 2002, WAVE TRASNMISSION RU
[3]
Geosynthetic tubes for confining pressurized slurry: Some design aspects
[J].
JOURNAL OF GEOTECHNICAL ENGINEERING-ASCE,
1996, 122 (08)
:682-690
[5]
Pilarczyk K. W., 2003, P 6 INT C COAST PORT
[6]
United States Army Corps of Engineers, 1984, SHOR PROT MAN
[7]
WAMSLEY H, 2002, ERDCCHLCHETN1145 US