A New Methodology for Stochastic Modelling of Pay Factors in Hot-Mix Asphalt Pavements

被引:7
作者
D'Apuzzo, Mauro [1 ]
Nicolosi, Vittorio [2 ]
机构
[1] Univ Cassino, Dept Mech Struct & Environm, I-03043 Cassino, Italy
[2] Univ Roma Tor Vergata, Dept Civil Engn, I-00133 Rome, Italy
关键词
Performance Specification; Pay Factor; Asphalt Pavements; Life-Cycle Cost; Beta Distribution;
D O I
10.1080/14680629.2010.9690347
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Since 1990 several research projects developing any Pay-Adjustment (PA) procedure for implementing Performance Related Specification (PRS) in Hot-Mix Asphalt (HMA) pavement construction have been issued. Previous studies proved that an approach based on life-cycle cost analysis and Monte Carlo simulation was an effective way to develop rational pay-adjustment procedures. However, the PRS systems developed so far had some significant weaknesses in the modelling of the variability of Materials and Construction (M&C) characteristics with corresponding PA. Furthermore they are mainly based on an empirical approach rather than on a mechanistic one. A new approach to model M&C variability in PRS systems, based on beta distribution, is introduced and a new stochastic method for pay-adjustment evaluation is developed. These criteria were embedded in a mechanistic system framework based on life-cycle cost analysis and Monte Carlo simulation. The model has been recently applied to a real case study and results are reported and analysed in this paperwork.
引用
收藏
页码:559 / 585
页数:27
相关论文
共 29 条
  • [1] *ANAS, 1998, CAP SPEC APP 2
  • [2] [Anonymous], FEDERAL HIGHWAY ADM
  • [3] [Anonymous], 2001, AASHTO GUID DES PAV
  • [4] Barber E.S., 1957, HIGHWAY RES BOARD B, V168, P1
  • [5] BENNET CR, 2004, 6 INT C MAN PAV BRIS
  • [6] Choi JH, 2004, TRANSPORT RES REC, P86
  • [7] *COST, 2000, 337 COST
  • [8] CRISPINO M, 1997, P 8 INT C ASPH PAV I
  • [9] DAPUZZO M, 2005, P 3 INT SIIV C SIIV
  • [10] DAPUZZO M, 2004, P 2 INT SIIV C SIIV