Factors Affecting Construction Labor Productivity: Iran Case Study

被引:12
作者
Rad, Kiyanoosh Golchin [1 ]
Kim, Soo-Yong [1 ]
机构
[1] Pukyong Natl Univ, Interdisciplinary Program Construct Engn & Manage, Dept Civil Engn, Yongso Ro 45, Busan 48513, South Korea
关键词
Labor productivity; Construction management; Exploratory Factor Analysis (EFA); Analytical Hierarchy Process (AHP); Structural Equation Model (SEM); STRUCTURAL EQUATION MODEL; EXPLORATORY FACTOR-ANALYSIS; FIT INDEXES; MANAGEMENT; AHP; PROJECTS; PERFORMANCE; TECHNOLOGY; IMPACT;
D O I
10.1007/s40996-018-0095-2
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Construction projects, as a labor-intensive industry, are directly involved with workforce management. Hence, the labor productivity issue is of remarkable interest in both the construction industry and academia because of its impact on time, cost, and quality of project. Due to the importance of labor productivity, an intensive literature review has been done to identify critical factors. However, a lack of previous studies on the causal relationships between labor productivity factors in the Iranian construction industry was discovered through the literature review. Hence, the study objective is to prioritize and highlight the factors most affecting construction labor productivity in Iran. The potential factors were identified and a questionnaire was prepared, including 33 factors, and it was then distributed among construction project managers who have more than 5 years of experience in the Iranian construction industry. Out of 200 questionnaires, 157 questionnaires were returned by participants. Of these, 152 valid collected data sets were analyzed through the Analytical Hierarchy Process (AHP) as a decision-making tool and the Structural Equation Model (SEM) as a multivariate analysis technique, in parallel for accuracy and reliability of findings. Findings from both tools, AHP and SEM, were compared. Eventually, "Labor Characteristics,'' by 0.384 priority weights, was selected as the most prioritized criteria; "Tools and Equipment'' was selected among six factors as the most common significant factor between both AHP and SEM, ranked by 0.191 priority weights in AHP and a 0.82 factor loading in SEM. Furthermore, "Lack of required tools and/or equipment'' has been ranked as the most significant sub-criteria with 0.444 weights; "Delay'' has been chosen as the most significant latent variable in SEM with a 0.83 factor lading. The results of the study would be valuable for any participants in the construction industry and academia, particularly civil engineers who are involved in Iranian or Middle Eastern construction projects.
引用
收藏
页码:165 / 180
页数:16
相关论文
共 108 条
  • [11] BENTLER PM, 1990, PSYCHOL BULL, V107, P238, DOI 10.1037/0033-2909.107.2.238
  • [12] A NEW INCREMENTAL FIT INDEX FOR GENERAL STRUCTURAL EQUATION MODELS
    BOLLEN, KA
    [J]. SOCIOLOGICAL METHODS & RESEARCH, 1989, 17 (03) : 303 - 316
  • [13] Browne M. W., 1993, TESTING STRUCTURAL E, P136, DOI DOI 10.1177/0049124192021002005
  • [14] ANALYZING RELATIONSHIPS AMONG SUCCESS VARIABLES OF CONSTRUCTION PARTNERING USING STRUCTURAL EQUATION MODELING: A CASE STUDY OF TAIWAN'S CONSTRUCTION INDUSTRY
    Chen, Wei Tong
    Chen, Tung-Tsan
    Lu, Chun Sheng
    Liu, Shu-Shun
    [J]. JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2012, 18 (06) : 783 - 794
  • [15] Construction partnering process and associated critical success factors: Quantitative investigation
    Cheng, EWL
    Li, H
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2002, 18 (04) : 194 - 202
  • [16] AN INVESTIGATION OF THE RELATIONSHIP BETWEEN ORGANIZATIONAL CULTURE AND THE PERFORMANCE OF CONSTRUCTION ORGANIZATIONS
    Cheung, Sai On
    Wong, Peter S. P.
    Lam, Anna L.
    [J]. JOURNAL OF BUSINESS ECONOMICS AND MANAGEMENT, 2012, 13 (04) : 688 - 704
  • [17] A review and evaluation of exploratory factor analysis practices in organizational research
    Conway, JM
    Huffcutt, AI
    [J]. ORGANIZATIONAL RESEARCH METHODS, 2003, 6 (02) : 147 - 168
  • [18] Cook R, 1999, DRUG TESTING TECHNOL, P255
  • [19] Analysis of craft workers' and foremen's perceptions of the factors affecting construction labour productivity
    Dai, Jiukun
    Goodrum, Paul M.
    Maloney, William F.
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2007, 25 (11) : 1139 - 1152
  • [20] Latent Structures of the Factors Affecting Construction Labor Productivity
    Dai, Jiukun
    Goodrum, Paul M.
    Maloney, William F.
    Srinivasan, Cidambi
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2009, 135 (05): : 397 - 406