Daily imaging scheduling of an earth observation satellite

被引:138
作者
Lin, WC [1 ]
Liao, DY
Liu, CY
Lee, YY
机构
[1] Natl Taiwan Univ, Dept Elect Engn, Taipei 106, Taiwan
[2] Natl Chi Nan Univ, Informat Management Dept, Nantou 545, Taiwan
[3] Ming Chuan Univ, Sch Commun, Taipei, Taiwan
[4] Natl Space Programs Off, Syst Engn Div, Hsinchu 300, Taiwan
来源
IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART A-SYSTEMS AND HUMANS | 2005年 / 35卷 / 02期
关键词
earth observation satellite; Lagrangian relaxation; satellite scheduling;
D O I
10.1109/TSMCA.2005.843380
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
This paper presents the development of a daily imaging scheduling system for a low-orbit, earth observation satellite. The daily imaging scheduling problem of satellite considers various imaging requests with different reward opportunities, changeover efforts between two consecutive imaging tasks,, cloud-coverage effects, and the availability of the spacecraft resource. It belongs to a class of single-machine scheduling problems with salient features of sequence-dependent setup, job assembly, and the constraint of operating time windows. The scheduling problem is formulated as an integer-programming problem, which is NP-hard in computational complexity. Lagrangian relaxation and linear search techniques are adopted to solve this problem. In order to demonstrate the efficiency and effectiveness of our solution methodology, a Tabu search-based algorithm is implemented, which is modified from the algorithm in Vasquez and Hao, 2001. Numerical results indicate that the approach is very effective to generate a near-optimal, feasible schedule for the imaging operations of the satellite. It is efficient in applications to the real problems. The Lagrangian-relaxation approach is superior to the Tabu search one in both optimality and computation time.
引用
收藏
页码:213 / 223
页数:11
相关论文
共 15 条
[1]  
AARTS E, 1997, LOCAL SEARCH COMBINA
[2]  
AGNESE JC, 1995, P 5 WORKSH ART INT K
[3]   MAXIMIZING THE VALUE OF A SPACE MISSION [J].
HALL, NG ;
MAGAZINE, MJ .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1994, 78 (02) :224-241
[4]  
Held M., 1974, Mathematical Programming, V6, P62, DOI 10.1007/BF01580223
[5]  
HOITOMT DJ, 1990, CONTROL SYSTEMS MAGA, V10, P34
[6]   IMPACT OF SEQUENCE-DEPENDENT SETUP TIME ON JOB-SHOP SCHEDULING PERFORMANCE [J].
KIM, SC ;
BOBROWSKI, PM .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1994, 32 (07) :1503-1520
[7]   Selecting and scheduling observations of agile satellites [J].
Lemaître, M ;
Verfaillie, G ;
Jouhaud, F ;
Lachiver, JM ;
Bataille, N .
AEROSPACE SCIENCE AND TECHNOLOGY, 2002, 6 (05) :367-381
[8]   Scheduling flexible flow shops with sequence-dependent setup effects [J].
Liu, CY ;
Chang, SC .
IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 2000, 16 (04) :408-419
[9]   SCHEDULING OF MANUFACTURING SYSTEMS USING THE LAGRANGIAN-RELAXATION TECHNIQUE [J].
LUH, PB ;
HOITOMT, DJ .
IEEE TRANSACTIONS ON AUTOMATIC CONTROL, 1993, 38 (07) :1066-1079
[10]   ROLLING HORIZON ALGORITHMS FOR A SINGLE-MACHINE DYNAMIC SCHEDULING PROBLEM WITH SEQUENCE-DEPENDENT SETUP TIMES [J].
OVACIK, IM ;
UZSOY, R .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1994, 32 (06) :1243-1263