Construction quality in China during transition: A review of literature and empirical examination

被引:37
作者
Yung, Ping [1 ]
Yip, Brenda [2 ]
机构
[1] Nottingham Trent Univ, Sch Architecture Design & Built Environm, Nottingham NG1 4BU, England
[2] Univ Hong Kong, Dept Real Estate & Construct, Hong Kong, Hong Kong, Peoples R China
关键词
Construction quality; State-Owned Enterprises; Resources; Demand; CRITICAL SUCCESS FACTORS; PROJECT SUCCESS; DESIGN-BUILD; LIFE-CYCLE; PERFORMANCE; REFORM; PERSPECTIVE; INDUSTRY; SYSTEMS; KEY;
D O I
10.1016/j.ijproman.2009.03.003
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Proper management processes were often regarded as the most important factors affecting construction quality, while the availability of capital, plant, and labour were taken for granted and the demands of property users were always ignored. The phenomenon that the construction quality of projects undertaken by State-Owned Enterprises (SOEs) was better than that of non-SOEs revealed that in developing countries such as China during transition, the availability of resources could be very important to construction quality. By utilizing regression models to evaluate 550 robust province level data from 1993 to 2001, this paper will offer an insight into the hard factors affecting construction quality. It is found that higher power of machinery per labourer, the use of more plants or machinery per in 2 of floor space, properties with larger unit areas, the growth of GDP, the higher labour productivity tender to be associated with higher quality. (C) 2009 Elsevier Ltd and IPMA. All rights reserved.
引用
收藏
页码:79 / 91
页数:13
相关论文
共 57 条
[1]  
ABDELRAZEK RH, 1998, ENG CONSTRUCT ARCHIT, V3, P220
[2]  
Abdul-Rahman H., 1996, CONSTR MANAG ECON, V14, P485, DOI [10.1080/014461996373197, DOI 10.1080/014461996373197]
[3]  
Abdul-Rahman H., 1997, International Journal of Quality and Reliability Management, V14, P464, DOI DOI 10.1108/02656719710170693
[4]   TEAM-BUILDING PROCESS - KEY TO BETTER PROJECT RESULTS [J].
ALBANESE, R .
JOURNAL OF MANAGEMENT IN ENGINEERING, 1994, 10 (06) :36-44
[5]  
[Anonymous], 1995, GROWING OUT PLAN CHI
[6]   Factors that affect process quality in the life cycle of building projects [J].
Arditi, D ;
Gunaydin, HM .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 1998, 124 (03) :194-203
[7]  
Baccarini David., 1999, Project Management Journal, V30, P25, DOI [10.1177/8756972899030004, DOI 10.1177/8756972899030004]
[8]  
Belassi W., 1996, International Journal of Project Management, V14, P141, DOI [https://doi.org/10.1016/0263-7863(95)00064-X, DOI 10.1016/0263-7863(95)00064-X]
[9]  
Belout A., 1998, INT J PROJ MANAG, V16, P21, DOI [DOI 10.1016/S0263-7863(97)00011-2, DOI 10.1016/50263-7863(97)00011-2]
[10]  
Chan A.P.C., 2000, INT J QUAL RELIAB MA, V17, P423, DOI [10.1108/02656710010298445, DOI 10.1108/02656710010298445]