Sellafield rock laboratory contracts put in place

被引:0
|
作者
不详
机构
来源
GROUND ENGINEERING | 1997年 / 30卷 / 01期
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
引用
收藏
页码:6 / 6
页数:1
相关论文
共 50 条
  • [1] NIREX PLANS FOR A ROCK LABORATORY AT SELLAFIELD
    HUTCHINS, J
    NUCLEAR ENGINEERING INTERNATIONAL, 1993, 38 (462): : 24 - 25
  • [2] Mox contracts raise hopes at Sellafield
    不详
    PROFESSIONAL ENGINEERING, 2001, 14 (09) : 9 - 9
  • [3] Rock joint and rock mass characterization at Sellafield
    Bhasin, R
    Barton, N
    Makurat, A
    Davies, N
    Hooper, A
    CHALLENGES FOR THE 21ST CENTURY, VOL I: INVESTIGATIONS, PLANNING AND DESIGN/UNDERGROUND SPACE USE/SUPPORT AND LINING OF TUNNELS, 1999, : 35 - 41
  • [4] Put contracts in writing!
    Chadwick, SA
    VETERINARY ECONOMICS, 2001, 42 (04): : 14 - 14
  • [5] PUT CONTRACTS UNDER THE GLASS
    BRAMSON, RS
    COMPUTER DECISIONS, 1985, 17 (22): : 96 - &
  • [6] Put in our place
    Marchant, J
    NEW SCIENTIST, 2001, 169 (2278) : 7 - 7
  • [7] Put tools in their place
    Noaker, PM
    MANUFACTURING ENGINEERING, 1996, 116 (03): : 49 - &
  • [8] HOW TO PLACE CONTRACTS
    不详
    NATURE, 1970, 226 (5245) : 495 - +
  • [9] A Comparative Analysis on Buy-back Contracts and Put Option Contracts
    Wan, Nana
    Chen, Xu
    2ND INTERNATIONAL CONFERENCE ON COMPLEX SCIENCE MANAGEMENT AND EDUCATION SCIENCE (CSMES 2015), 2015, : 284 - 289
  • [10] Gummer to decide soon on Sellafield rock lab inquiry
    不详
    PROFESSIONAL ENGINEERING, 1997, 10 (03) : 7 - 7