A Branch and Bound Algorithm Based on Petri Nets for Diverse Complex Cluster Tool Scheduling Problems

被引:0
|
作者
Hao, Wang [1 ]
机构
[1] China Elect Technol Grp Corp, Inst 28, Nanjing 210007, Jiangsu, Peoples R China
来源
2015 27TH CHINESE CONTROL AND DECISION CONFERENCE (CCDC) | 2015年
关键词
Cluster Tools; Petri Net; Branch and Bound Algorithm; Equipment Front End Module;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper proposes an efficient algorithm to deal with various scheduling requirements of diverse structure cluster tools. Cluster tools not only have complex flow patterns such as parallel PMs, wafer residency time constraints and dual-arm robot, but also have different structures such as the equipment front-end module which consists of an aligner, a signal-arm robot and two load locks. Different solutions for different requirements may be impractical. To solve this problem, the Petri net models of different configured cluster tool with diverse scheduling requirements is developed first. Then, based on the Petri net models the state search tree is presented, which can efficiently determine the local optimal scheduling sequence. Through experiments, the effectiveness of the branch and bound algorithm proposed in this paper is verified.
引用
收藏
页码:5482 / 5487
页数:6
相关论文
共 50 条
  • [31] A polynomial-time decomposition algorithm for petri nets based on indexes of transitions
    Zeng Q.
    Information Technology Journal, 2011, 10 (04) : 856 - 862
  • [32] Rule and branch-and-bound algorithm based sequencing of machining features for process planning of complex parts
    Wei Wang
    Yingguang Li
    Lingling Huang
    Journal of Intelligent Manufacturing, 2018, 29 : 1329 - 1336
  • [33] A BRANCH-AND-BOUND-BASED ALGORITHM FOR NONCONVEX MULTIOBJECTIVE OPTIMIZATION
    Niebling, Julia
    Eichfelder, Gabriele
    SIAM JOURNAL ON OPTIMIZATION, 2019, 29 (01) : 794 - 821
  • [34] Developing a Game-Based Learning for Branch and Bound Algorithm
    Aditya, Stefanus James
    Santoso, Harry Budi
    Isal, R. Yugo Kartono
    2019 11TH INTERNATIONAL CONFERENCE ON ADVANCED COMPUTER SCIENCE AND INFORMATION SYSTEMS (ICACSIS 2019), 2019, : 471 - 476
  • [35] The scheduling and performance analysis of cluster tools with buffers based on branch searching
    Gao Z.-S.
    Zhou B.-H.
    Zidonghua Xuebao/Acta Automatica Sinica, 2016, 42 (01): : 81 - 88
  • [36] Schedulability and scheduling of dual-arm cluster tools with residency time constraints based on Petri net
    Wu, Naiqi
    Zhou, MengChu
    2006 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING, VOLS 1 AND 2, 2006, : 87 - +
  • [37] A branch-and-bound algorithm based on NSGAII for multi-objective mixed integer nonlinear optimization problems
    Jaber, A.
    Lafon, P.
    Younes, R.
    ENGINEERING OPTIMIZATION, 2022, 54 (06) : 1004 - 1022
  • [38] Modeling and Analysis of Medical Resource Sharing and Scheduling for Public Health Emergencies based on Petri Nets
    Yu, WangYang
    Jia, MengHan
    Yuan, Bo
    2021 17TH INTERNATIONAL CONFERENCE ON MOBILITY, SENSING AND NETWORKING (MSN 2021), 2021, : 358 - 365
  • [39] FMS scheduling based on Timed Petri net model and RTA* algorithm
    Kim, Y
    Inaba, A
    Suzuki, T
    Okuma, S
    2001 IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION, VOLS I-IV, PROCEEDINGS, 2001, : 848 - 853
  • [40] An efficient branch-and-bound algorithm for the two-machine bicriteria flowshop scheduling problem
    Yeh, WC
    JOURNAL OF MANUFACTURING SYSTEMS, 2001, 20 (02) : 113 - 123