Comparative Analysis of the Implementation of the SMED Method on Selected Production Stands

被引:22
作者
Antosz, Katarzyna [1 ]
Pacana, Andrzej [1 ]
机构
[1] Rzeszow Univ Technol, Fac Mech Engn & Aeronaut, Al Powstancow Warszawy 12, PL-35959 Rzeszow, Poland
来源
TEHNICKI VJESNIK-TECHNICAL GAZETTE | 2018年 / 25卷
关键词
changeover; Lean Manufacturing; maintenance; performance of machines; SMED method; SETUP TIME REDUCTION; AUTOMOBILE-INDUSTRY; IMPROVEMENT; COMPANY; SYSTEM; TOOLS;
D O I
10.17559/TV-20160411095705
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Nowadays, companies are looking for newer and newer methods in order to increase their efficiency and effectiveness. Many of them decide to implement Lean Manufacturing philosophy because the benefits of the introduction of this philosophy apply not only to the industrial but also to the financial and commercial areas. These changes can increase the efficiency of production realized with small investments, improve product quality, reduce inventory as well as material consumption. This philosophy can shorten the delivery time and product quality what leads to the increased customer satisfaction and enhances the competitiveness of enterprises. One of the tools of Lean Manufacturing is the Single Minute Exchange of Die (SMED) method. The implementation of this method reduces machines changeover time, which is a waste. This method makes it possible to implement a continuous flow of the product without long waiting times and, most importantly, without any performance loss. The results of the implementation of the SMED method on several different production work stands are presented in this work. The selected stands differ in type (conventional, semi-automatic, automatic) and their role in a production process (bottlenecks, support process). The work, by means of indicative evaluation, assesses the ability to increase the efficiency of machines for the analysed production work stands. The work indicates the effects a company may expect having decided to implement the SMED method for the production areas that are a part of either the main or support processes.
引用
收藏
页码:276 / 282
页数:7
相关论文
共 30 条
[1]   The significance of reducing setup times/setup costs [J].
Allahverdi, Ali ;
Soroush, H. M. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 187 (03) :978-984
[2]  
Antosz K., 2013, NARZEDZIA LEAN MANUF
[3]  
Bansal Shrikant, 2011, International Journal of Computer Aided Engineering and Technology, V3, P107, DOI 10.1504/IJCAET.2011.038821
[4]  
Blecharczyk M, 2015, THESIS
[5]   Enhancing SMED: Changeover Out of Machine Evaluation Technique to implement the duplication strategy [J].
Braglia, M. ;
Frosolini, M. ;
Gallo, M. .
PRODUCTION PLANNING & CONTROL, 2016, 27 (04) :328-342
[6]   Set-up time reduction process and integrated predetermined time system MTM-UAS: A study of application in a large size company of automobile industry [J].
Cakmakci, Mehmet ;
Karasu, Mahmut Kemal .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2007, 33 (3-4) :334-344
[7]   Process improvement: performance analysis of the setup time reduction-SMED in the automobile industry [J].
Cakmakci, Mehmet .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 41 (1-2) :168-179
[8]  
Carrizo Moreira António, 2011, Journal of Technology Management & Innovation, V6, P129
[9]   The Design of JMP/SAP Based Six Sigma Management System and its Application in SMED [J].
Chen, Siyu ;
Fan, Shuhai ;
Xiong, Jiawei ;
Zhang, Wenqian .
13TH GLOBAL CONGRESS ON MANUFACTURING AND MANAGEMENT, 2017, 174 :416-424
[10]  
Chmura J, 2013, THESIS