Run sum chart for monitoring multivariate coefficient of variation

被引:42
作者
Lim, Alex J. X. [1 ]
Khoo, Michael B. C. [1 ]
Teoh, W. L. [2 ]
Haq, Abdul [3 ]
机构
[1] Univ Sains Malaysia, Sch Math Sci, George Town 11800, Malaysia
[2] Heriot Watt Univ Malaysia, Sch Math & Comp Sci, Putrajaya 62200, Malaysia
[3] Quaid I Azam Univ, Dept Stat, Islamabad, Pakistan
关键词
Coefficient of variation (CV); Run sum; Average run length (ARL); Standard deviation of the run length (SDRL); Expected average run length (EARL); Markov chain; ZONE CONTROL CHART; PERFORMANCE; SHEWHART;
D O I
10.1016/j.cie.2017.04.023
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Coefficient of variation (CV) is an important quality characteristic to take into account when the process mean and standard deviation are not constants. A setback of the existing chart for monitoring the multivariate CV is that the chart is slow in detecting a multivariate CV shift in the Phase-II process. To overcome this problem, this paper proposes a run sum chart for monitoring the multivariate CV in the Phase-II process. The average run length (ARL), standard deviation of the run length (SDRL) and expected average run length (EARL), under the zero state and steady state cases, are used to compare the performance of the proposed chart with the existing multivariate CV chart. The proposed chart's optimal parameters are computed using the Mathematica programs, based on the Markov chain model. Two one-sided run sum charts for monitoring the multivariate CV are considered, where they can be used simultaneously to detect increasing and decreasing multivariate CV shifts. The effects of different in-control CV values, number of regions, shift and sample sizes, and number of variables being monitored are studied. The implementation of the proposed chart is illustrated with an example using the data dealing with steel sleeve inside diameters. (C) 2017 Elsevier Ltd. All rights reserved.
引用
收藏
页码:84 / 95
页数:12
相关论文
共 50 条
[41]   The efficiency of CUSUM schemes for monitoring the multivariate coefficient of variation in short runs process [J].
Hu, Xuelong ;
Ma, Yixuan ;
Zhang, Jiening ;
Zhang, Jiujun ;
Yeganeh, Ali ;
Shongwe, Sandile Charles .
JOURNAL OF APPLIED STATISTICS, 2025, 52 (04) :966-992
[42]   Multivariate cumulative sum control chart for compositional data with known and estimated process parameters [J].
Imran, Muhammad ;
Sun, Jinsheng ;
Zaidi, Fatima Sehar ;
Abbas, Zameer ;
Nazir, Hafiz Zafar .
QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2022, 38 (05) :2691-2714
[43]   The variable sample size and sampling interval run sum Max chart [J].
Antzoulakos, D. L. ;
Fountoukidis, K. G. ;
Rakitzis, A. C. .
QUALITY TECHNOLOGY AND QUANTITATIVE MANAGEMENT, 2025, 22 (02) :321-344
[44]   Monitoring the coefficient of variation using a variable sample size control chart in short production runs [J].
Amdouni, Asma ;
Castagliola, Philippe ;
Taleb, Hassen ;
Celano, Giovanni .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2015, 81 (1-4) :1-14
[45]   A variable sampling interval Shewhart control chart for monitoring the coefficient of variation in short production runs [J].
Amdouni, Asma ;
Castagliola, Philippe ;
Taleb, Hassen ;
Celano, Giovanni .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2017, 55 (19) :5521-5536
[46]   Variable sample size and sampling interval (VSSI) and variable parameters (VP) run sum charts for the coefficient of variation [J].
Yeong, Wai Chung ;
Tan, Yen Yoon ;
Lim, Sok Li ;
Khaw, Khai Wah ;
Khoo, Michael Boon Chong .
QUALITY TECHNOLOGY AND QUANTITATIVE MANAGEMENT, 2024, 21 (02) :177-199
[47]   The multivariate exponentially weighted moving average chart for monitoring short production runs [J].
Lee, Ming Ha ;
Tan, Vie Ming ;
Haq, Abdul ;
Khoo, Michael B. C. ;
Chew, XinYing ;
Teoh, Wei Lin .
COMMUNICATIONS IN STATISTICS-SIMULATION AND COMPUTATION, 2024, 53 (07) :3554-3569
[48]   Multivariate coefficient of variation charts with measurement errors [J].
Ayyoub, Heba N. ;
Khoo, Michael B. C. ;
Saha, Sajal ;
Castagliola, Philippe .
COMPUTERS & INDUSTRIAL ENGINEERING, 2020, 147 (147)
[49]   A weighted dual cumulative sum chart for monitoring the process mean [J].
Rabia, Mahwish ;
Haq, Abdul .
QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2025, 41 (01) :361-376
[50]   Monitoring multivariate coefficient of variation with upward Shewhart and EWMA charts in the presence of measurement errors using the linear covariate error model [J].
Ayyoub, Heba N. ;
Khoo, Michael B. C. ;
Lee, Ming Ha ;
Haq, Abdul .
QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2021, 37 (02) :694-716