Sustainable Personnel Scheduling Problem Optimization in a Natural Gas Combined-Cycle Power Plant

被引:7
作者
Ozder, Emir Huseyin [1 ]
Ozcan, Evrencan [2 ]
Eren, Tamer [2 ]
机构
[1] Baskent Univ, Fac Commercial Sci, Dept Management Informat, TR-06790 Ankara, Turkey
[2] Kirikkale Univ, Fac Engn, Dept Ind Engn, TR-71450 Kirikkale, Turkey
关键词
skill-based personnel scheduling; analytic network process (ANP); goal programming (GP); optimization; natural gas combined-cycle power plant; electricity generation sector; GOAL PROGRAMMING-MODEL; MANAGEMENT; SYSTEMS;
D O I
10.3390/pr7100702
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
This paper deals with a sustainable personnel scheduling problem of personnel working in a large-scale natural gas combined-cycle power plant in Turkey. The proposed model focuses on employee complaints due to unfair work schedules and the results of balanced assignments based on power plant interruptions. Eighty personnel work in three shifts at this natural gas combined-cycle power plant. The model is solved with respect to some of the workers' skills, and there are 20 criteria regarding skills. The analytic network process method is used to get the weights of workers' skills, which are calculated and included in the model. Goal programming is used in this paper. Our proposed model gives cost minimization and fair work schedules for the power plant. Compared with the literature, the number and set of criteria are unique in terms of personnel competency in the energy sector. Minimizing cost and imbalanced assignments was achieved by the proposed model for the first time without considering the sector.
引用
收藏
页数:23
相关论文
共 67 条
[1]   Personnel scheduling in a complex logistic system: a railway application case [J].
Alfieri, Arianna ;
Kroon, Leo ;
van de Velde, Steef .
JOURNAL OF INTELLIGENT MANUFACTURING, 2007, 18 (02) :223-232
[2]   Empowerment scheduling for a field workforce [J].
Alsheddy, Abdullah ;
Tsang, Edward P. K. .
JOURNAL OF SCHEDULING, 2011, 14 (06) :639-654
[3]   Providing an integrated Model for Planning and Scheduling Energy Hubs and preventive maintenance [J].
Amiri, S. ;
Honarvar, M. ;
Sadegheih, A. .
ENERGY, 2018, 163 :1093-1114
[4]   A genetic algorithm for the design of job rotation schedules considering ergonomic and competence criteria [J].
Asensio-Cuesta, S. ;
Diego-Mas, J. A. ;
Canos-Daros, L. ;
Andres-Romano, C. .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 60 (9-12) :1161-1174
[5]   Bridging the gap between self schedules and feasible schedules in staff scheduling [J].
Asgeirsson, Eyjolfur Ingi .
ANNALS OF OPERATIONS RESEARCH, 2014, 218 (01) :51-69
[6]   A 0-1 goal programming model for nurse scheduling [J].
Azaiez, MN ;
Al Sharif, SS .
COMPUTERS & OPERATIONS RESEARCH, 2005, 32 (03) :491-507
[7]  
Ba N., 2012, INT J ENG RES DEV, V1, P2
[8]   Staff scheduling at the United States Postal Service [J].
Bard, JF ;
Binici, C ;
deSilva, AH .
COMPUTERS & OPERATIONS RESEARCH, 2003, 30 (05) :745-771
[9]  
Bektur G., 2013, J EC ADM SCI, V15, P385
[10]   Modeling staff scheduling problems.: A tutorial [J].
Blöchliger, I .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 158 (03) :533-542