Agent-based Three Layer Framework of Assembly-Oriented Planning and Scheduling for Discrete Manufacturing Enterprises

被引:0
作者
Fan, Yinghui [1 ]
Anwar, Sohel [1 ]
Wang, Litao [2 ]
机构
[1] IUPUI Purdue Univ, Purdue Sch Engn & Technol, Dept Mech Engn, Indianapolis, IN 46202 USA
[2] Shantou Univ, Electromech Engn Dept, Shantou 515063, GD, Peoples R China
来源
2018 IEEE 14TH INTERNATIONAL CONFERENCE ON CONTROL AND AUTOMATION (ICCA) | 2018年
关键词
WEIGHTED TARDINESS; ALGORITHM;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
To solve the cost burden caused by delivery tardiness for small and medium sized packaging machinery enterprises, the assembly-oriented planning and scheduling is studied based on the multi-agent technology. Taking into account the due date, the planning and scheduling are optimized iteratively with the rule-based algorithms complying with the machining and assembling process constraints. To make the realistic large-scale production planning scheme tailored to fit the optimization algorithms, a multi-agent system is utilized to conceptually construct a three-layer framework corresponding to three planning horizons of different task level. These planning horizons are quarter/month of product/subassembly level, week of part level, and day of operation level. With the strategy of combining top-down task decomposition and bottom-up plan update (where the quarterly orders are decomposed into the monthly, weekly, and daily tasks according to the product processing structure while the resulting plans of every layer are updated iteratively based on the bottom layer optimization), the proposed framework not only addresses the planning but also the periodic and event-driven scheduling of the processes. In this paper, a gravure printing machine is considered as a test case for evaluating the proposed framework. The simulation results with the historical data of the orders for this machine demonstrate the effectiveness of the proposed scheme on the control of the distribution of idle-time. It can also provide a resolution to tardiness penalty for small and medium sized enterprises.
引用
收藏
页码:506 / 511
页数:6
相关论文
共 18 条
  • [1] Conway R W., EXPT INVESTIGATION P
  • [2] Finin T., 1993, TECHNICAL REPORT
  • [3] ALGORITHMS FOR SOLVING PRODUCTION-SCHEDULING PROBLEMS
    GIFFLER, B
    THOMPSON, GL
    [J]. OPERATIONS RESEARCH, 1960, 8 (04) : 487 - 503
  • [4] A holonic multi-agent methodology to design sustainable intelligent manufacturing control systems
    Giret, Adriana
    Trentesaux, Damien
    Salido, Miguel A.
    Garcia, Emilia
    Adam, Emmanuel
    [J]. JOURNAL OF CLEANER PRODUCTION, 2017, 167 : 1370 - 1386
  • [5] Multi-agent-based scheduling methods for hybrid cellular production lines in semiconductor industry
    Kim, Jungyun
    Chung, Seong Youb
    Yoon, Hyun Joong
    [J]. PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 2014, 228 (12) : 1701 - 1712
  • [6] A heuristic to minimize the total weighted tardiness with sequence-dependent setups
    Lee, YH
    Bhaskaran, K
    Pinedo, M
    [J]. IIE TRANSACTIONS, 1997, 29 (01) : 45 - 52
  • [7] A multi-agent-based mould due date setting approach in stochastic production
    Liu, J. J.
    Chen, Q. X.
    Mao, N.
    Lin, Z. A.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (05) : 1353 - 1371
  • [8] Hybrid flowshop scheduling with batch-discrete processors and machine maintenance in time windows
    Luo, Hao
    Huang, George Q.
    Zhang, Ying Feng
    Dai, Qing Yun
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (06) : 1575 - 1603
  • [9] FMS PERFORMANCE UNDER BALANCING MACHINE WORKLOAD AND MINIMIZING PART MOVEMENT RULES
    Pereira, A.
    [J]. INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2011, 10 (02) : 91 - 103
  • [10] Pinedo ML, 2012, SCHEDULING: THEORY, ALGORITHMS, AND SYSTEMS, FOURTH EDITION, P1, DOI 10.1007/978-1-4614-2361-4