On a bi-criteria flow shop scheduling problem under constraints of blocking and sequence dependent setup time

被引:19
作者
Aqil, Said [1 ]
Allali, Karam [1 ]
机构
[1] Univ Hassan II Casablanca, Lab Math & Applicat, FST, POB 146, Mohammadia, Morocco
关键词
Flow shop; Sequence-dependent setup time; Blocking; Bi-criteria optimization; Mixed integer linear programming; Metaheuristic; LOCAL SEARCH ALGORITHM; ITERATED GREEDY ALGORITHM; PERMUTATION FLOWSHOP; OPTIMIZATION ALGORITHM; TOTAL EARLINESS; M-MACHINE; TARDINESS; HEURISTICS; MAKESPAN; MINIMIZE;
D O I
10.1007/s10479-019-03490-x
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper, we propose a bi-criteria optimization model for a flow shop scheduling problem with permutation, blocking and sequence dependent setup time. Indeed, these constraints are the most encountered in the industrial field, which demands high command flexibility. The objective is the minimization of two criteria, in our case the makespan and the total tardiness combined in a single objective function with a weighting coefficient for each criterion. To solve this problem, we propose a mixed integer linear programming method and a set of different metaheuristics. The suggested metaheuristics are; the genetic algorithm, the iterated greedy metaheuristic and the iterative local search algorithm. This last algorithm is proposed in two ways of exploration of the neighborhood. To verify the effectiveness of our resolution algorithms, a set of instances with n jobs and m machines is randomly generated from small instances to relatively large size ones. The analysis of the suggested simulation model allowed us to note that the iterative local search algorithm gives good results compared to the iterative greedy algorithm. Moreover, it was found that the weighting parameter plays an essential role in the problem decision making. However, it was established that it is difficult to find a good solution that minimizes both criteria at once, a suitable compromise will be necessary to be adopted using the weighting coefficient.
引用
收藏
页码:615 / 637
页数:23
相关论文
共 42 条
[1]   RETRACTED: A hybrid whale optimization algorithm based on local search strategy for the permutation flow shop scheduling problem (Retracted article. See vol. 128, pg. 567, 2022) [J].
Abdel-Basset, Mohamed ;
Manogaran, Gunasekaran ;
El-Shahat, Doaa ;
Mirjalili, Seyedali .
FUTURE GENERATION COMPUTER SYSTEMS-THE INTERNATIONAL JOURNAL OF ESCIENCE, 2018, 85 :129-145
[2]   A multi-restart iterated local search algorithm for the permutation flow shop problem minimizing total flow time [J].
Dong, Xingye ;
Chen, Ping ;
Huang, Houkuan ;
Nowak, Maciek .
COMPUTERS & OPERATIONS RESEARCH, 2013, 40 (02) :627-632
[3]   An iterated local search algorithm for the permutation flowshop problem with total flowtime criterion [J].
Dong, Xingye ;
Huang, Houkuan ;
Chen, Ping .
COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (05) :1664-1669
[4]   Iterated-greedy-based algorithms with beam search initialization for the permutation flowshop to minimise total tardiness [J].
Fernandez-Viagas, Victor ;
Valente, Jorge M. S. ;
Framinan, Jose M. .
EXPERT SYSTEMS WITH APPLICATIONS, 2018, 94 :58-69
[5]   An improved multi-objective evolutionary algorithm based on decomposition for energy-efficient permutation flow shop scheduling problem with sequence-dependent setup time [J].
Jiang, En-da ;
Wang, Ling .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2019, 57 (06) :1756-1771
[6]  
Johnson SM, 1954, NAV RES LOGIST Q, V1, P61, DOI [10.1002/nav.3800010110, DOI 10.1002/NAV.3800010110]
[7]   Multiobjective Discrete Artificial Bee Colony Algorithm for Multiobjective Permutation Flow Shop Scheduling Problem With Sequence Dependent Setup Times [J].
Li, Xiangtao ;
Ma, Shijing .
IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2017, 64 (02) :149-165
[8]   Multiobjective Local Search Algorithm-Based Decomposition for Multiobjective Permutation Flow Shop Scheduling Problem [J].
Li, Xiangtao ;
Li, Mingjie .
IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2015, 62 (04) :544-557
[9]   An iterated greedy heuristic for no-wait flow shops with sequence dependent setup times, learning and forgetting effects [J].
Li, Xiaoping ;
Yang, Zhi ;
Ruiz, Ruben ;
Chen, Tian ;
Sui, Shaochun .
INFORMATION SCIENCES, 2018, 453 :408-425
[10]   Minimizing energy consumption and tardiness penalty for fuzzy flow shop scheduling with state-dependent setup time [J].
Liu, Guo-Sheng ;
Zhou, Ya ;
Yang, Hai-Dong .
JOURNAL OF CLEANER PRODUCTION, 2017, 147 :470-484