A way for flow-shop scheduling when time buffer is considered
被引:0
作者:
Cai, YB
论文数: 0引用数: 0
h-index: 0
机构:
Wuhan Univ Technol, Sch Management, Wuhan 430070, Peoples R ChinaWuhan Univ Technol, Sch Management, Wuhan 430070, Peoples R China
Cai, YB
[1
]
Li, BQ
论文数: 0引用数: 0
h-index: 0
机构:
Wuhan Univ Technol, Sch Management, Wuhan 430070, Peoples R ChinaWuhan Univ Technol, Sch Management, Wuhan 430070, Peoples R China
Li, BQ
[1
]
机构:
[1] Wuhan Univ Technol, Sch Management, Wuhan 430070, Peoples R China
来源:
PROCEEDINGS OF '97 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING
|
1997年
关键词:
buffer;
flow-shop;
bottleneck;
work in process;
D O I:
暂无
中图分类号:
F8 [财政、金融];
学科分类号:
0202 ;
摘要:
The buffer is one of the three basic elements (the drum, the buffer, the rope) of Optimized Production Technology(OPT). This paper gives a new heuristics which decides the patch of each part on every machine try using the relationship of different throughput of the machines. Then, it gains a new schedule in a flow-shop that can ensure the minimum idle time and the largest batches on bottleneck.