Assessment of performance indices of selected gas turbine power plants in Nigeria

被引:11
作者
Oyedepo, Sunday Olayinka [1 ]
Fagbenle, Richard Olayiwola [2 ]
Adefila, Samuel Sunday [3 ]
机构
[1] Covenant Univ, Dept Mech Engn, Ota, Nigeria
[2] Obafemi Awolowo Univ, Dept Mech Engn, Ife, Nigeria
[3] Covenant Univ, Dept Chem Engn, Ota, Nigeria
来源
ENERGY SCIENCE & ENGINEERING | 2015年 / 3卷 / 03期
关键词
Availability; electricity; performance indices; plant factor; power plant; reliability; RELIABILITY;
D O I
10.1002/ese3.61
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
In this study, performance assessment of selected gas turbine power plants in Nigeria was evaluated using performance indices. The results of the study showed that for the period under review (2006-2010), the percentage shortfalls from the target energy in the selected power plants range from 26.33% to 86.61% as against the acceptable value of 5-10%. The capacity factor of the selected power plants varies from 16.88% to 73.67% as against the international value of 50-80%. The plant use factor varies from 45.89% to 97.03% and the utilization factor varies from 6.31% to 93.074% as against the international best practice of over 95%. From this result, it can be concluded that the generating units were underutilized. This is due to inadequate routine maintenance and equipment fault development. The analyses of reliability indicators revealed that the mean time between failures varies from 5.42 to 378.44 h, the mean time to repair varies from 18.3 to 153.88 h and the plant availability varies from 12.86% to 91.31% as against the Institute of Electrical and Electronics Engineers recommended standard of 99.9%. Evaluation of operating figures of the selected power plants revealed that starting reliability (SR) and operating reliability vary from 71.95% to 93.9% and 5.33% to 55%, respectively. The SR of the selected power plants is low in value compared with standard value of 99.9%. The statistical analysis carried out on plant availability revealed that at 95% confidence level; there is a significant difference in availability of the selected power plants. This indicates differences in their systems installation, operation and maintenance. The performance indicator developed to evaluate the performance indices for the selected stations can also be applicable to other power stations in Nigeria and elsewhere. Measures to improve the performance indices of the plants have been suggested in this paper.
引用
收藏
页码:239 / 256
页数:18
相关论文
共 50 条
  • [21] Stochastic modeling and availability optimization of condenser used in steam turbine power plants using GA and PSO
    Saini, Monika
    Gupta, Nivedita
    Shankar, Venkatesh Gauri
    Kumar, Ashish
    QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2022, 38 (05) : 2670 - 2690
  • [22] Monitoring Metal Wear Particles of Friction Pairs in the Oil Systems of Gas Turbine Power Plants
    Belopukhov, Valentin
    Blinov, Andrey
    Borovik, Sergey
    Luchsheva, Mariya
    Muhutdinov, Farit
    Podlipnov, Petr
    Sazhenkov, Aleksey
    Sekisov, Yuriy
    ENERGIES, 2022, 15 (13)
  • [23] Investigating the behavior of statistical indices for performance assessment of a reservoir
    Jain, Sharad K.
    JOURNAL OF HYDROLOGY, 2010, 391 (1-2) : 92 - 98
  • [24] The Effect of Vibration on the Sediment of Foundations of Turbine Units of Nuclear Power Plants
    Altynbekov, Shakhmaksut
    NATURAL GEO-DISASTERS AND RESILIENCY, CREST 2023, 2024, 445 : 511 - 521
  • [25] EFFECT OF THE STRUCTURE OF COMBINED GAS-STEAM TURBINE PLANTS UPON THEIR RELIABILITY
    LAMPERT, D
    BROWN BOVERI REVIEW, 1979, 66 (02): : 133 - 143
  • [26] EXERGOECONOMIC OPTIMIZATION OF GAS TURBINE POWER PLANTS OPERATING PARAMETERS USING GENETIC ALGORITHMS: A CASE STUDY
    Gorji-Bandpy, Mofid
    Goodarzian, Hamed
    THERMAL SCIENCE, 2011, 15 (01): : 43 - 54
  • [27] Modeling and optimum design of hybrid solid oxide fuel cell-gas turbine power plants
    Mehrpooya, Mehdi
    Akbarpour, Sepide
    Vatani, Ali
    Rosen, Marc A.
    INTERNATIONAL JOURNAL OF HYDROGEN ENERGY, 2014, 39 (36) : 21196 - 21214
  • [28] Performance optimization of hydroelectric power-plants using computational intelligence techniques
    Kumar A.
    Maan V.S.
    Saini M.
    International Journal of Information Technology, 2024, 16 (4) : 2215 - 2227
  • [29] An analysis of the power sector performance in Nigeria
    Oseni, Musiliu O.
    RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2011, 15 (09) : 4765 - 4774
  • [30] Local Power Grid Assessment of the Power System Expansion Considering Captive Power Plants
    Afandi, A. N.
    Gumilar, Langlang
    Fadlika, Irham
    4TH INTERNATIONAL CONFERENCE ON INDUSTRIAL, MECHANICAL, ELECTRICAL, AND CHEMICAL ENGINEERING, 2019, 2097