Stochastic resource-constrained project scheduling problem with time varying weather conditions and an improved estimation of distribution algorithm

被引:12
|
作者
Zhou, Yifan [1 ]
Miao, Jindan [1 ]
Yan, Bin [2 ]
Zhang, Zhisheng [1 ]
机构
[1] Southeast Univ, Sch Mech Engn, Nanjing 211189, Peoples R China
[2] Beijing Goldwind Sci & Creat Windpower Equipment, Beijing 100176, Peoples R China
基金
中国国家自然科学基金;
关键词
SRCPSP; Estimation of distribution algorithm; Ranking and selection; Common random numbers; SELECTION; OPTIMIZATION; UNCERTAINTY; DURATION; RANKING; EDA;
D O I
10.1016/j.cie.2021.107322
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Construction projects with outdoor operations are affected by time-varying weather conditions. However, most existing research on stochastic resource-constrained project scheduling problems (SRCPSPs) considers activity duration as a random variable from a time-independent distribution. To address this issue, this study investigates SRCPSP under time-varying weather conditions; an improved estimation of distribution algorithm (EDA) including a ranking and selection method using common random numbers is proposed for enhancing the performance of project scheduling. The benchmark J120 dataset from PSPLIB and a practical case of windfarm construction are used to validate the improved EDA. For three randomly selected cases from the J120 dataset, the improved EDA can reduce the expected makespan by 17.0, 29.4, and 12.5 days when compared with deterministic scheduling. The corresponding makespan reductions obtained by the original EDA are 10.8, 22.7, and 7.1 days. Similarly, the improved EDA obtains 23% higher expected makespan reduction for the practical case.
引用
收藏
页数:15
相关论文
共 50 条
  • [31] Resource-constrained project scheduling approach under fuzzy conditions
    Knyazeva, Margarita
    Bozhenyuk, Alexander
    Rozenberg, Igor
    ICTE IN REGIONAL DEVELOPMENT 2015, 2015, 77 : 56 - 64
  • [32] A column-generation-based algorithm for a resource-constrained project scheduling problem with a fractional shared resource
    Wang, Qiang
    Liu, Changchun
    Zheng, Li
    ENGINEERING OPTIMIZATION, 2020, 52 (05) : 798 - 816
  • [33] Resource-Constrained Project Scheduling for Timely Project Completion with Stochastic Activity Durations
    Ballestin, Francisco
    Leus, Roel
    PRODUCTION AND OPERATIONS MANAGEMENT, 2009, 18 (04) : 459 - 474
  • [34] Supply chain integrated resource-constrained multi-project scheduling problem
    Asadujjaman, Md.
    Rahman, Humyun Fuad
    Chakrabortty, Ripon K.
    Ryan, Michael J.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2024, 194
  • [35] Hybrid genetic algorithm for bi-objective resource-constrained project scheduling
    Kucuksayacigil, Fikri
    Ulusoy, Gunduz
    FRONTIERS OF ENGINEERING MANAGEMENT, 2020, 7 (03) : 426 - 446
  • [36] A linear-discrete scheduling model for the resource-constrained project scheduling problem
    Bonnal, Pierre
    Gourc, Didier
    Hameri, Ari-Pekka
    Lacoste, Germain
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2005, 23 (08) : 797 - 814
  • [37] Improved genetic algorithm for resource-constrained scheduling of large projects
    Kim, Jin-Lee
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2009, 36 (06) : 1016 - 1027
  • [38] Bi-objective resource-constrained project scheduling problem with time-dependent resource costs
    Alcaraz, Javier
    Anton-Sanchez, Laura
    Saldanha-da-Gama, Francisco
    JOURNAL OF MANUFACTURING SYSTEMS, 2022, 63 : 506 - 523
  • [39] A Path-Relinking algorithm for the multi-mode resource-constrained project scheduling problem
    Fernandes Muritiba, Albert Einstein
    Rodrigues, Carlos Diego
    da Costa, Franciio Araujo
    COMPUTERS & OPERATIONS RESEARCH, 2018, 92 : 145 - 154
  • [40] A Hybrid Algorithm Based on Simplex Search and Differential Evolution for Resource-Constrained Project Scheduling Problem
    Wang, Ling
    Xu, Ye
    Fang, Chen
    ADVANCED INTELLIGENT COMPUTING, 2011, 6838 : 568 - 575