Stochastic resource-constrained project scheduling problem with time varying weather conditions and an improved estimation of distribution algorithm

被引:12
|
作者
Zhou, Yifan [1 ]
Miao, Jindan [1 ]
Yan, Bin [2 ]
Zhang, Zhisheng [1 ]
机构
[1] Southeast Univ, Sch Mech Engn, Nanjing 211189, Peoples R China
[2] Beijing Goldwind Sci & Creat Windpower Equipment, Beijing 100176, Peoples R China
基金
中国国家自然科学基金;
关键词
SRCPSP; Estimation of distribution algorithm; Ranking and selection; Common random numbers; SELECTION; OPTIMIZATION; UNCERTAINTY; DURATION; RANKING; EDA;
D O I
10.1016/j.cie.2021.107322
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Construction projects with outdoor operations are affected by time-varying weather conditions. However, most existing research on stochastic resource-constrained project scheduling problems (SRCPSPs) considers activity duration as a random variable from a time-independent distribution. To address this issue, this study investigates SRCPSP under time-varying weather conditions; an improved estimation of distribution algorithm (EDA) including a ranking and selection method using common random numbers is proposed for enhancing the performance of project scheduling. The benchmark J120 dataset from PSPLIB and a practical case of windfarm construction are used to validate the improved EDA. For three randomly selected cases from the J120 dataset, the improved EDA can reduce the expected makespan by 17.0, 29.4, and 12.5 days when compared with deterministic scheduling. The corresponding makespan reductions obtained by the original EDA are 10.8, 22.7, and 7.1 days. Similarly, the improved EDA obtains 23% higher expected makespan reduction for the practical case.
引用
收藏
页数:15
相关论文
共 50 条
  • [21] A Hybrid Multiobjective Genetic Algorithm for Robust Resource-Constrained Project Scheduling with Stochastic Durations
    Xiong, Jian
    Chen, Ying-wu
    Yang, Ke-wei
    Zhao, Qing-song
    Xing, Li-ning
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2012, 2012
  • [22] A resource flow-based branch-and-bound algorithm to solve fuzzy stochastic resource-constrained project scheduling problem
    Alipouri, Yaghoub
    SOFT COMPUTING, 2021, 25 (22) : 14315 - 14331
  • [23] Heuristic Optimization for Robust Resource-Constrained Flexible Project Scheduling Problem
    Liu, Yongli
    Li, Renjie
    Liu, Huiran
    IEEE ACCESS, 2020, 8 : 142269 - 142281
  • [24] A Memetic Algorithm for Multiskill Resource-Constrained Project Scheduling Problem under Linear Deterioration
    Dai, Huafeng
    Cheng, Wenming
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2019, 2019
  • [25] Hybrid multimode resource-constrained maintenance project scheduling problem
    Kosztyan, Zsolt T.
    Pribojszki-Nemeth, Aniko
    Szalkai, Istvan
    OPERATIONS RESEARCH PERSPECTIVES, 2019, 6
  • [26] Solving resource-constrained project scheduling problem with evolutionary programming
    Sebt, M. H.
    Alipouri, Y.
    Alipouri, Y.
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2013, 64 (09) : 1327 - 1335
  • [27] A genetic algorithm for scheduling multimode resource-constrained project problem in the presence of preemptive resources
    Delgoshaei, Aidin
    Hanjani, Sepehr Esmaeili
    Nasiri, Amir Hossein
    JOURNAL OF PROJECT MANAGEMENT, 2019, 4 (03) : 195 - 212
  • [28] A Permutation-Based Bees Algorithm for Solving Resource-Constrained Project Scheduling Problem
    Nemmich, Mohamed Amine
    Fatima, Debbat
    Slimane, Mohamed
    INTERNATIONAL JOURNAL OF SWARM INTELLIGENCE RESEARCH, 2019, 10 (04) : 1 - 24
  • [29] Resource-constrained project scheduling problem: Review of recent developments
    Khajesaeedi, Sahar
    Sadjadi, Seyed Jafar
    Barzinpour, Farnaz
    Moghaddam, Reza Tavakkoli
    JOURNAL OF PROJECT MANAGEMENT, 2025, 10 (01) : 1 - 26
  • [30] A branch-and-bound algorithm for the proactive resource-constrained project scheduling problem with a robustness maximization objective
    Li, Xue
    He, Zhengwen
    Wang, Nengmin
    COMPUTERS & OPERATIONS RESEARCH, 2024, 166