Stochastic resource-constrained project scheduling problem with time varying weather conditions and an improved estimation of distribution algorithm

被引:12
|
作者
Zhou, Yifan [1 ]
Miao, Jindan [1 ]
Yan, Bin [2 ]
Zhang, Zhisheng [1 ]
机构
[1] Southeast Univ, Sch Mech Engn, Nanjing 211189, Peoples R China
[2] Beijing Goldwind Sci & Creat Windpower Equipment, Beijing 100176, Peoples R China
基金
中国国家自然科学基金;
关键词
SRCPSP; Estimation of distribution algorithm; Ranking and selection; Common random numbers; SELECTION; OPTIMIZATION; UNCERTAINTY; DURATION; RANKING; EDA;
D O I
10.1016/j.cie.2021.107322
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Construction projects with outdoor operations are affected by time-varying weather conditions. However, most existing research on stochastic resource-constrained project scheduling problems (SRCPSPs) considers activity duration as a random variable from a time-independent distribution. To address this issue, this study investigates SRCPSP under time-varying weather conditions; an improved estimation of distribution algorithm (EDA) including a ranking and selection method using common random numbers is proposed for enhancing the performance of project scheduling. The benchmark J120 dataset from PSPLIB and a practical case of windfarm construction are used to validate the improved EDA. For three randomly selected cases from the J120 dataset, the improved EDA can reduce the expected makespan by 17.0, 29.4, and 12.5 days when compared with deterministic scheduling. The corresponding makespan reductions obtained by the original EDA are 10.8, 22.7, and 7.1 days. Similarly, the improved EDA obtains 23% higher expected makespan reduction for the practical case.
引用
收藏
页数:15
相关论文
共 50 条
  • [1] An estimation of distribution algorithm for resource-constrained project scheduling problem
    Fang, Chen
    Wang, Ling
    Xu, Ye
    2010 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-5, 2010, : 265 - 270
  • [2] An estimation of distribution algorithm and new computational results for the stochastic resource-constrained project scheduling problem
    Chen Fang
    Rainer Kolisch
    Ling Wang
    Chundi Mu
    Flexible Services and Manufacturing Journal, 2015, 27 : 585 - 605
  • [3] An estimation of distribution algorithm and new computational results for the stochastic resource-constrained project scheduling problem
    Fang, Chen
    Kolisch, Rainer
    Wang, Ling
    Mu, Chundi
    FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2015, 27 (04) : 585 - 605
  • [4] A hybrid estimation of distribution algorithm for solving the resource-constrained project scheduling problem
    Wang, Ling
    Fang, Chen
    EXPERT SYSTEMS WITH APPLICATIONS, 2012, 39 (03) : 2451 - 2460
  • [5] An effective estimation of distribution algorithm for the multi-mode resource-constrained project scheduling problem
    Wang, Ling
    Fang, Chen
    COMPUTERS & OPERATIONS RESEARCH, 2012, 39 (02) : 449 - 460
  • [6] A Pareto-Archived Estimation-of-Distribution Algorithm for Multiobjective Resource-Constrained Project Scheduling Problem
    Wang, Ling
    Fang, Chen
    Mu, Chun-Di
    Liu, Min
    IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2013, 60 (03) : 617 - 626
  • [7] New strategies for stochastic resource-constrained project scheduling
    Rostami, Salim
    Creemers, Stefan
    Leus, Roel
    JOURNAL OF SCHEDULING, 2018, 21 (03) : 349 - 365
  • [8] An Orthogonal hybrid algorithm for the resource-constrained project scheduling problem
    Huang, Zhiyu
    2008 7TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-23, 2008, : 8292 - 8297
  • [9] New Benchmark Results for the Stochastic Resource-Constrained Project Scheduling Problem
    Leus, Roel
    Rostami, Salim
    Creemers, Stefan
    2015 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2015, : 204 - 208
  • [10] New strategies for stochastic resource-constrained project scheduling
    Salim Rostami
    Stefan Creemers
    Roel Leus
    Journal of Scheduling, 2018, 21 : 349 - 365