Imperative Causes of Delays in Construction Projects from Developers' Outlook

被引:20
作者
Mydin, M. A. Othuman [1 ]
Sani, N. Md [1 ]
Taib, M. [1 ]
Alias, N. Mohd [1 ]
机构
[1] Univ Sains Malaysia, Sch Housing Bldg & Planning, George Town 11800, Malaysia
来源
BUILDING SURVEYING AND TECHNOLOGY UNDERGRADUATE CONFERENCE | 2014年 / 10卷
关键词
D O I
10.1051/matecconf/20141006005
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Project delays in the construction industry are a universal or large-scale observable fact affecting not only the construction industry but the overall economy of countries as well. As far as the Malaysian construction industry is concerned, project delays are common problems in the construction industry, particularly in housing development. The objective of this study is to evaluate and identify the causes and the consequences of project delays in private housing development projects in Malaysia, and the remedies that can minimize these delays. The top ten causes of delays are weather conditions, poor site conditions, poor site management, incomplete documents, lack of experience, financial problems, contract modifications, delay in the approval of major variations, contractor coordination problems with other parties, and construction mistakes and defective works. It has been analysed that the causes of the delays point to the contractor factors, which contribute to the major factors that cause project delays in private housing development projects. The consequences of the delays include time overrun, cost overrun, differences in opinion, negotiations, legal actions and total abandonment. Herewith are presented some recommendations to minimize these project delays.
引用
收藏
页数:6
相关论文
共 9 条
  • [1] Aibinu A.A., 2002, INT J PROJ MANAG, V20, P593, DOI [DOI 10.1016/S0263-7863(02)00028-5, 10.1016/S0263-7863, DOI 10.1016/S0263-7863, 10.1016/S0263-7863(02)00028-5]
  • [2] Ajanlekoko J.O., 1987, LAGOS QS DIGEST LAGO, V1, P8
  • [3] Akinsola A.O., 1996, C P ASS RES CONSTR M, P507
  • [4] Al-Momani A., 2002, INT J PROJ MANAG, V20, P51
  • [5] Alkass S., 1996, CONSTR MANAG ECON, V14, P375, DOI [DOI 10.1080/014461996373250, 10.1080/014461996373250]
  • [6] Causes of delay in large construction projects
    Construction Engineering and Management Department, King Fahd University of Petroleum and Minerals, Box # 680, Dhahran, 31261, Saudi Arabia
    [J]. Int. J. Proj. Manage., 2006, 4 (349-357): : 349 - 357
  • [7] CAUSES OF DELAY IN LARGE BUILDING CONSTRUCTION PROJECTS
    ASSAF, SA
    ALKHALIL, M
    ALHAZMI, M
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 1995, 11 (02) : 45 - 50
  • [8] Chan D. W. M., 1997, International Journal of Project Management, V15, P55, DOI 10.1016/S0263-7863(96)00039-7
  • [9] Chan D.W.M., 2002, International Journal of Project Management, V20, P23, DOI DOI 10.1016/S0263-7863(00)00032-6