共 51 条
[1]
Almond S., 1995, SPE EUR FORM DAM C 1, P1, DOI [10.2118/30096-MS, DOI 10.2118/30096-MS]
[2]
Andrews J. S., 1998, SPE ISRM ROCK MECH P, DOI [10.2118/47382-MS, DOI 10.2118/47382-MS]
[3]
[Anonymous], 1999, SPE ANN TECHN C EXH, DOI DOI 10.2118/56726-MS
[4]
Reservoir and Completion Considerations for the Refracturing of Horizontal Wells
[J].
SPE PRODUCTION & OPERATIONS,
2018, 33 (01)
:1-11
[5]
Economic Optimization of Horizontal-Well Completions in Unconventional Reservoirs
[J].
SPE PRODUCTION & OPERATIONS,
2015, 30 (04)
:293-311
[6]
Barree R. D., 1995, LOW PERM RES S DENV, DOI [10.2118/29600-MS, DOI 10.2118/29600-MS]
[7]
STABILITY AND FAILURE OF SAND ARCHES
[J].
SOCIETY OF PETROLEUM ENGINEERS JOURNAL,
1981, 21 (02)
:236-248
[9]
[曹广胜 Cao Guangsheng], 2019, [新疆石油地质, Xinjiang Petroleum Geology], V40, P218