A bi-level model integrating planning and scheduling for the optimization of process operation and energy consumption of a PVC plant under uncertainty

被引:2
作者
Su, Jian [1 ]
Wang, Yuhong [1 ]
机构
[1] China Univ Petr, Coll Control Sci & Engn, Qingdao 266580, Shandong, Peoples R China
关键词
Uncertainty; Bi-level model; PVC scheduling; Data-driven robust optimization; ROBUST OPTIMIZATION; DESIGN;
D O I
10.1016/j.compchemeng.2022.108033
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
PVC production by the calcium carbide method is a typical hybrid system consisting of continuous and intermittent processing, and the optimization of the whole process scheduling is of practical significance. Still, the existence of uncertain factors in the external environment and production process makes it challenging to continue to implement deterministic scheduling. This paper, therefore, proposes an integration model, the discrete-time method applied in the planning layer, and the chance-constrained programming used to deal with external uncertainties. The continuous-time modeling method based on event points is adopted in the scheduling layer, and the optimization of equipment-level operations with variable production rates is performed. Then, the data-driven robust optimization method is applied to deal with endogenous uncertainty based on the data-driven flexible uncertainty set. Finally, the results provide valuable guidance to improve the robustness and stability of the production system under uncertainty. The comparative results verify the effectiveness and superiority of the proposed model in total cost and energy consumption.
引用
收藏
页数:13
相关论文
共 30 条
[1]  
BEALE EML, 1955, J ROY STAT SOC B, V17, P173
[2]   Data-driven optimization of mixed-integer bi-level multi-follower integrated planning and scheduling problems under demand uncertainty [J].
Beykal, Burcu ;
Avraamidou, Styliani ;
Pistikopoulos, Efstratios N. .
COMPUTERS & CHEMICAL ENGINEERING, 2022, 156
[3]   Forecast, solution, and rolling horizons in operations management problems: A classified bibliography [J].
Chand, Suresh ;
Hsu, Vernon Ning ;
Sethi, Suresh .
Manufacturing and Service Operations Management, 2002, 4 (01) :25-43
[4]   Integrated planning and scheduling under production uncertainties: Bi-level model formulation and hybrid solution method [J].
Chu, Yunfei ;
You, Fengqi ;
Wassick, John M. ;
Agarwal, Anshul .
COMPUTERS & CHEMICAL ENGINEERING, 2015, 72 :255-272
[5]   A data-driven approach for crude oil scheduling optimization under product yield uncertainty [J].
Dai, Xin ;
Zhao, Liang ;
Li, Zhi ;
Du, Wenli ;
Zhong, Weimin ;
He, Renchu ;
Qian, Feng .
CHEMICAL ENGINEERING SCIENCE, 2021, 246
[6]  
Dimitriadis A. D., 1997, Computers & Chemical Engineering, V21, pS1061, DOI 10.1016/S0098-1354(97)00190-7
[7]   A decomposition method for the simultaneous planning and scheduling of single-stage continuous multiproduct plants [J].
Erdirik-Dogan, M ;
Grossmann, IE .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2006, 45 (01) :299-315
[8]  
Fan H.B., 2012, ZHONGGUO LUJIAN, P1
[9]   Plant Planning Optimization under Time-Varying Uncertainty: Case Study on a Poly(vinyl chloride) Plant [J].
Gao, Xiaoyong ;
Wang, Yuhong ;
Feng, Zhenhui ;
Huang, Dexian ;
Chen, Tao .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2018, 57 (36) :12182-12191
[10]   Piecewise Linear Approximation Based MILP Method for PVC Plant Planning Optimization [J].
Gao, Xiaoyong ;
Feng, Zhenhui ;
Wang, Yuhong ;
Huang, Xiaolin ;
Huang, Dexian ;
Chen, Tao ;
Lian, Xue .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2018, 57 (04) :1233-1244