River basin planning: from qualitative to quantitative flood risk assessment: the case of Abruzzo Region (central Italy)

被引:27
作者
Scorzini, Anna Rita [1 ]
Leopardi, Maurizio [1 ]
机构
[1] Univ Aquila, Dept Civil Environm & Architectural Engn, Via G Gronchi 18, I-67100 Laquila, Italy
关键词
Flood risk; Mapping; Hazard; Flood damage; Uncertainty; Cost-benefit analysis; DAMAGE; MODEL; UNCERTAINTY; INUNDATION; LOSSES; EUROPE; IMPACT;
D O I
10.1007/s11069-017-2857-8
中图分类号
P [天文学、地球科学];
学科分类号
07 ;
摘要
Flood risk assessments are becoming an essential tool for a rational decision-making in river basin planning throughout Europe. In order to comply with the prescriptions of the Floods Directive, quantitative approaches, based on the estimation of the expected annual damage as a risk indicator, should increasingly be used for flood risk mapping in addition to the traditional qualitative methods. In this paper, a comparative application of the two methodologies to the river basins of the Abruzzo Region (central Italy) was performed for evaluating their strengths and weaknesses. The analysis was limited to direct damage estimation. The results showed that qualitative mapping could not be considered a fully effective tool for the identification of appropriate flood risk management strategies due to its limits in representing the real flood risk scenarios, mainly related to the use of a coarse hazard classification. Therefore, if it could be used at the basin scale for a preliminary identification of high-risk areas, it should be integrated with a more analytical assessment of the expected losses with quantitative models. However, a sensitivity analysis on the quantitative methodology showed that the large uncertainties inherent in damage modelling (with difference factors ranging from 2 to 10) may hinder the reliability of the estimates, with possible repercussions on the results of economic appraisals. Two case studies on the implementation of flood risk reduction measures confirmed that damage model uncertainty had huge influence on the results of cost-benefit analyses, with net present values switching from negative to positive according to the selection of the damage functions and the economic values of the exposed assets.
引用
收藏
页码:71 / 93
页数:23
相关论文
共 50 条
[1]  
Abruzzo Region, 2014, PIAN STRALC DIF ALL
[2]  
Abruzzo Region Commissario Delegato Aterno-Pescara, 2011, PROGETTO OPERE MESSA
[3]  
Abruzzo Region Commissario Delegato Aterno-Pescara, 2009, OP LAM PIEN FIUM PES
[4]  
[Anonymous], 2007, FLOOD RISK MANAGEMEN
[5]  
[Anonymous], T320401 FLOODSITE CO
[6]   Flood risk assessment and associated uncertainty [J].
Apel, H ;
Thieken, AH ;
Merz, B ;
Blöschl, G .
NATURAL HAZARDS AND EARTH SYSTEM SCIENCES, 2004, 4 (02) :295-308
[7]   Flood risk analyses-how detailed do we need to be? [J].
Apel, H. ;
Aronica, G. T. ;
Kreibich, H. ;
Thieken, A. H. .
NATURAL HAZARDS, 2009, 49 (01) :79-98
[8]   Assessing trends in insured losses from floods in Spain 1971-2008 [J].
Barredo, J. I. ;
Sauri, D. ;
Llasat, M. C. .
NATURAL HAZARDS AND EARTH SYSTEM SCIENCES, 2012, 12 (05) :1723-1729
[9]   Normalised flood losses in Europe: 1970-2006 [J].
Barredo, J. I. .
NATURAL HAZARDS AND EARTH SYSTEM SCIENCES, 2009, 9 (01) :97-104
[10]   Changes in future flood risk due to climate and development in a Dutch polder area [J].
Bouwer, Laurens M. ;
Bubeck, Philip ;
Aerts, Jeroen C. J. H. .
GLOBAL ENVIRONMENTAL CHANGE-HUMAN AND POLICY DIMENSIONS, 2010, 20 (03) :463-471