Risk assessment for public-private partnership projects: using a fuzzy analytic hierarchical process method and expert opinion in China

被引:47
作者
Li, Yan [1 ,2 ]
Wang, Xinyu [1 ]
机构
[1] China Univ Min & Technol, Sch Management, Xuzhou, Jiangsu, Peoples R China
[2] Chinese Postal Serv Grp, Training Ctr, Shijiazhuang, Hebei, Peoples R China
关键词
risk assessment; risk management; public-private partnership (PPP); fuzzy analytic hierarchy process (F-AHP); China; INFRASTRUCTURE; MODEL; PPP;
D O I
10.1080/13669877.2016.1264451
中图分类号
C [社会科学总论];
学科分类号
03 ; 0303 ;
摘要
Public-private partnerships (PPP) have been widely used in China to procure public facilities and services. Complicated problems in PPP projects in China arise because of a variety of risk factors. A proper risk assessment model is needed to identify risks and provide risk response strategies for future Chinese PPP projects. The fuzzy analytic hierarchy process (F-AHP) method provides the ability to solve complex risk assessment of PPP projects. Current risk assessment models are limited to PPP projects in specific countries and do not consider unique risks in China, especially political, economic, social, and legal risks. This paper designed a risk evaluation index system for PPP projects based on the Delphi expert investigation method, and then established an optimized risk evaluation model for PPP projects in China using the F-AHP method. The risks identified are confirmed by interviewing experts from Chinese local government departments, private enterprise, third-party intermediary consulting and regulatory agencies, and academic organizations. The results show that the risks that ranked among the top ten are closely related to China's political and economic policies and relationships among stakeholders. It can be concluded that government authorities play a critical role in providing a favorable political, social, and economic environment and an effective institutional framework for PPP projects. Furthermore, it is also important to deal with relationships among stakeholders based on the public-private win-win' principle. This study provides risk response strategies, addressing key issues from eight aspects: an impeccable legal and regulatory framework; a central coordinating and regulating PPP authority; supportive governmental authorities; institutional capacity-building; favorable economic conditions and viability; community, partner, and moral accountability; clear division of responsibilities through contracts; and effective advisory management. These effective measures may be useful in reducing the adverse effects of risk for PPP projects in China.
引用
收藏
页码:952 / 973
页数:22
相关论文
共 52 条
[1]   Risk Management in the Construction Industry Using Combined Fuzzy FMEA and Fuzzy AHP [J].
Abdelgawad, Mohamed ;
Fayek, Aminah Robinson .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2010, 136 (09) :1028-1036
[2]   Energy consumption, political regime and economic growth in sub-Saharan Africa [J].
Adams, Samuel ;
Klobodu, Edem Kwame Mensah ;
Opoku, Eric Evans Osei .
ENERGY POLICY, 2016, 96 :36-44
[3]   Political Influence on Public-Private Partnerships in the Public Health Sector in New Zealand [J].
Asquith, Andy ;
Brunton, Margaret ;
Robinson, David .
INTERNATIONAL JOURNAL OF PUBLIC ADMINISTRATION, 2015, 38 (03) :179-188
[4]  
BALCI O, 1989, 1989 WINTER SIMULATION CONFERENCE PROCEEDINGS, P62, DOI 10.1145/76738.76746
[5]  
Beyene T.T., 2014, International Journal of Science and Research, V3, P792
[6]  
CHEE TS, 1995, 1995 IEEE ANNUAL INTERNATIONAL ENGINEERING MANAGEMENT CONFERENCE PROCEEDINGS OF, P275, DOI 10.1109/IEMC.1995.524593
[7]  
Cheng JH, 2001, 10TH IEEE INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS, VOLS 1-3, P356, DOI 10.1109/FUZZ.2001.1007322
[8]   Economic and socio-economic assessment methods for ocean renewable energy: Public and private perspectives [J].
Dalton, Gordon ;
Allan, Grant ;
Beaumont, Nicola ;
Georgakaki, Aliki ;
Hacking, Nick ;
Hooper, Tara ;
Kerr, Sandy ;
O'Hagan, Anne Marie ;
Reilly, Kieran ;
Ricci, Pierpaolo ;
Sheng, Wanan ;
Stallard, Tim .
RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2015, 45 :850-878
[9]  
Fan X. J., 2007, J SHANGHAI JIAOTONG, V20, P451
[10]  
Fayek A., 1998, Eng. Manage. J, V10, P29, DOI DOI 10.1080/10429247.1998.11415005