Data-driven real-time power dispatch for maximizing variable renewable generation

被引:35
作者
Li, Zhigang [1 ]
Qiu, Feng [2 ]
Wang, Jianhui [2 ]
机构
[1] Tsinghua Univ, Dept Elect Engn, Beijing 100084, Peoples R China
[2] Argonne Natl Lab, Div Energy Syst, 9700 S Cass Ave, Argonne, IL 60439 USA
关键词
Data-driven; Real-time dispatch; Renewable energy generation; Uncertainty; UNIT COMMITMENT; OPTIMIZATION;
D O I
10.1016/j.apenergy.2016.02.125
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Traditional power dispatch methods have difficulties in accommodating large-scale variable renewable generation (VRG) and have resulted in unnecessary VRG spillage in the practical industry. The recent dispatchable-interval-based methods have the potential to reduce VRG curtailment, but the dispatchable intervals are not allocated effectively due to the lack of exploiting historical dispatch records of VRG units. To bridge this gap, this paper proposes a novel data-driven real-time dispatch approach to maximize VRG utilization by using do-not-exceed (DNE) limits. This approach defines the maximum generation output ranges that the system can accommodate without compromising reliability. The DNE limits of VRG units and operating base points of conventional units are co-optimized by hybrid stochastic and robust optimization, and the decision models are formulated as mixed-integer linear programs by the sample average approximation technique exploiting historical VRG data. A strategy for selecting historical data samples is also proposed to capture the VRG uncertainty more accurately under variant prediction output levels. Computational experiments show the effectiveness of the proposed methods. (C) 2016 Elsevier Ltd. All rights reserved.
引用
收藏
页码:304 / 313
页数:10
相关论文
共 22 条
[1]   Exploring the Modeling Capacity of Two-Stage Robust Optimization: Variants of Robust Unit Commitment Model [J].
An, Yu ;
Zeng, Bo .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2015, 30 (01) :109-122
[2]  
[Anonymous], 2014, WIND SOLAR ENERGY CU
[3]  
Bai L, 2015, APPL ENERGY
[4]  
Jiang R., 2011, Benders decomposition for the twostage security constrained robust unit commitment problem
[5]   On the uncertainty of wind power predictions - Analysis of the forecast accuracy and statistical distribution of errors [J].
Lange, M .
JOURNAL OF SOLAR ENERGY ENGINEERING-TRANSACTIONS OF THE ASME, 2005, 127 (02) :177-184
[6]   Combined Heat and Power Dispatch Considering Pipeline Energy Storage of District Heating Network [J].
Li, Zhigang ;
Wu, Wenchuan ;
Shahidehpour, Mohammad ;
Wang, Jianhui ;
Zhang, Boming .
IEEE TRANSACTIONS ON SUSTAINABLE ENERGY, 2016, 7 (01) :12-22
[7]   Adjustable Robust Real-Time Power Dispatch With Large-Scale Wind Power Integration [J].
Li, Zhigang ;
Wu, Wenchuan ;
Zhang, Boming ;
Wang, Bin .
IEEE TRANSACTIONS ON SUSTAINABLE ENERGY, 2015, 6 (02) :357-368
[8]  
Lindenberg S.:., 2008, 20% Wind Energy By 2030: Increasing Wind Energy's Contribution to U.S. Electricity Supply
[9]   Comprehensive evaluation of ARMA-GARCH(-M) approaches for modeling the mean and volatility of wind speed [J].
Liu, Heping ;
Erdem, Ergin ;
Shi, Jing .
APPLIED ENERGY, 2011, 88 (03) :724-732
[10]   A SAMPLE APPROXIMATION APPROACH FOR OPTIMIZATION WITH PROBABILISTIC CONSTRAINTS [J].
Luedtke, James ;
Ahmed, Shabbir .
SIAM JOURNAL ON OPTIMIZATION, 2008, 19 (02) :674-699