Energy Saving under low DO concentration with real-time control

被引:0
作者
Zuo Jinlong [1 ]
Yue Chao [1 ]
机构
[1] Harbin Univ Commerce, Dept Environm Engn, Harbin, Peoples R China
来源
2010 INTERNATIONAL CONFERENCE ON INNOVATIVE COMPUTING AND COMMUNICATION AND 2010 ASIA-PACIFIC CONFERENCE ON INFORMATION TECHNOLOGY AND OCEAN ENGINEERING: CICC-ITOE 2010, PROCEEDINGS | 2010年
关键词
low DO; SBR process; real-time control; enegy saving; SEQUENCING BATCH REACTOR; BIOLOGICAL NUTRIENT REMOVAL; WASTE-WATER; NITRITE ACCUMULATION; NITROGEN REMOVAL; NITRIFICATION; AERATION; SYSTEM;
D O I
10.1109/CICC-ITOE.2010.42
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
In order to save the energy of the wastewater treatment, the SBR process was investigated under low DO condition with real-time control. The pH, DO and ORP probes were monitored online with the reaction temperature was 23 +/- 0.5., MLSS was 2500 mg/L and the aeration volume was 20 L/h. The results showed that PO(4)(3-)-P and the ammonia concentration in the reactor were completely removed with real-time control. The DO value increased slowly in the first 150 minutes and then began to increase sharply. So at this time the aeration was stopped to save supply air amounts about 17% compared with no real time control. So the real-time control strategy has been set up under low DO condition, and this method could save the energy consumption of the wastewater treatment.
引用
收藏
页码:133 / 136
页数:4
相关论文
共 19 条
[1]   Monitoring and control of biological nutrient removal in a Sequencing Batch Reactor [J].
Akin, BS ;
Ugurlu, A .
PROCESS BIOCHEMISTRY, 2005, 40 (08) :2873-2878
[2]  
ALBELING U, 1992, WATER SCI TECHNOL, V26, P1007
[3]   On-line control of a SBR system for nitrogen removal from industrial wastewater [J].
Andreottola, G ;
Foladori, P ;
Ragazzi, M .
WATER SCIENCE AND TECHNOLOGY, 2001, 43 (03) :93-100
[4]  
APHA, 1998, STAND METH EX WAT WA, P89
[5]   Optimal operational factors for nitrite accumulation in batch reactors [J].
Bae, W ;
Baek, S ;
Chung, J ;
Lee, Y .
BIODEGRADATION, 2001, 12 (05) :359-366
[6]  
CHAPENTIER J, 1998, WATER SCI TECHNOL, V38, P197
[7]   Approach for a novel control strategy for simultaneous nitrification/denitrification in activated sludge reactors [J].
Fuerhacker, M ;
Bauer, H ;
Ellinger, R ;
Sree, U ;
Schmid, H ;
Zibuschka, F ;
Puxbaum, H .
WATER RESEARCH, 2000, 34 (09) :2499-2506
[8]  
Ghusain I. A, 1994, WAT SCI TECH, V30, P159
[9]  
GHUSAIN IA, 1995, J ENV ENG, V121, P225
[10]   Hydraulic residence time effects in biological nutrient removal using five-step sequencing batch reactor [J].
Kargi, F ;
Uygur, A .
ENZYME AND MICROBIAL TECHNOLOGY, 2004, 35 (2-3) :167-172