Productivity Measurement and Improvement for Public Construction Projects

被引:3
|
作者
Zhan, Wenting [1 ]
Pan, Wei [2 ]
Hao, Gang [3 ]
机构
[1] Zhejiang Shuren Univ, Sch Management, Dept Publ Adm, Shuren Rd, Hangzhou 310015, Zhejiang, Peoples R China
[2] Univ Hong Kong, Dept Civil Engn, Pokfulam, Hong Kong, Peoples R China
[3] City Univ Hong Kong, Dept Management Sci, Hong Kong, Peoples R China
关键词
Productivity measurement; Productivity improvement; Public construction project; Constant-elasticity-of-substitution function; PERFORMANCE-MEASUREMENT; MANAGEMENT; FRAMEWORK;
D O I
10.1061/(ASCE)CO.1943-7862.0002282
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Large-scale public construction projects often become expensive white elephants requiring considerable postconstruction maintenance. Thus there is a pressing need to integrate construction and postconstruction stages into productivity measurement and analysis. However, previous studies of productivity measurement focused on the efficiency of the project delivery phase, but overlooked the utilization of the constructed facility. This paper developed a two-stage construction project productivity (CPP) measurement model by integrating site efficiency (SE) and utilization effectiveness to investigate strategies for improving the overall CPP. An as-usual setting, which delineates the measurement of CPP, was developed as the benchmark model. Given the relative nature of the productivity concept, two scenarios were considered for CPP improvement. The enhancement scenario was introduced by adding a requirement that CPP is enhanced compared with that in the benchmark model. Then a transcendence scenario was developed to ensure that CPP is better than SE. Strategies for CPP improvement were formulated and were analyzed using the analytical models developed. This study for the first time distinguished the substitutionarity and complementarity between facility occupation and facility management in the postconstruction stage, and claims that the opposite natures offer opposite strategies for CPP improvement. The empirical analysis revealed the law of diminishing marginal utility of facility management. This paper contributes to the body of knowledge by extending the productivity measurement model from the construction stage only to the integration of the construction and postconstruction stages, and by offering two productivity improvement scenarios for strategy formulation. Methodologically, this paper offers a two-stage productivity measurement model and its improvement models in a mathematical way. Managerially, based on the developed models, this work offers the evidence and quantitative guidance for the policy makers and public clients to strategically improve CPP of public projects.
引用
收藏
页数:12
相关论文
共 50 条
  • [41] Evaluation of organizational procurement performance for public construction projects: systematic review
    Alsamarraie, Mundher M.
    Ghazali, Farid
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2023, 23 (14) : 2499 - 2508
  • [42] Critical Factors Influencing the Performance of Public Housing Construction Projects in Myanmar
    Nwal, Su Su
    Panuwatwanich, Kriengsak
    Naing, Myint
    JOURNAL OF CONSTRUCTION IN DEVELOPING COUNTRIES, 2024, 29 (01) : 163 - 190
  • [43] A method to encourage and assess innovations in public tenders for infrastructure and construction projects
    Lenderink, Bart
    Halman, Johannes I. M.
    Boes, Hans
    Voordijk, Hans
    CONSTRUCTION INNOVATION-ENGLAND, 2020, 20 (02): : 171 - 189
  • [44] Cost overruns of public sector construction projects: a developing country perspective
    Asiedu, Richard Ohene
    Adaku, Ebenezer
    INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2019, 13 (01) : 66 - 84
  • [45] Identification of factors affecting productivity in Thailand's construction industry and proposed maturity model for improvement of the productivity
    Pornthcpkasemsant, Patraporn
    Charoenpornpattana, Santi
    JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2019, 17 (05) : 849 - 861
  • [46] Establishing Outsourcing and Supply Chain Plans for Prefabricated Construction Projects Under Uncertain Productivity
    Hsu, Pei-Yuan
    Aurisicchio, Marco
    Angeloudis, Panagiotis
    COMPUTATIONAL LOGISTICS, ICCL 2017, 2017, 10572 : 529 - 543
  • [47] Construction productivity prediction through Bayesian networks for building projects: case from Vietnam
    Khanh, Ha Duy
    Kim, Soo Yong
    Linh, Le Quoc
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2023, 30 (05) : 2075 - 2100
  • [48] The productivity measurement and enhancement system: A meta-analysis
    Pritchard, Robert D.
    Harrell, Melissa M.
    DiazGranados, Deborah
    Guzman, Melissa J.
    JOURNAL OF APPLIED PSYCHOLOGY, 2008, 93 (03) : 540 - 567
  • [49] Potential Improvement of Building Information Modeling (BIM) Implementation in Malaysian Construction Projects
    Latiffi, Aryani Ahmad
    Mohd, Suzila
    Rakiman, Umol Syamsyul
    PRODUCT LIFECYCLE MANAGEMENT IN THE ERA OF INTERNET OF THINGS, PLM 2015, 2016, 467 : 149 - 158
  • [50] Barriers to environmental sustainability of construction projects
    Opoku, De-Graft Joe
    Ayarkwa, Joshua
    Agyekum, Kofi
    SMART AND SUSTAINABLE BUILT ENVIRONMENT, 2019, 8 (04) : 292 - 306