Productivity Measurement and Improvement for Public Construction Projects

被引:3
|
作者
Zhan, Wenting [1 ]
Pan, Wei [2 ]
Hao, Gang [3 ]
机构
[1] Zhejiang Shuren Univ, Sch Management, Dept Publ Adm, Shuren Rd, Hangzhou 310015, Zhejiang, Peoples R China
[2] Univ Hong Kong, Dept Civil Engn, Pokfulam, Hong Kong, Peoples R China
[3] City Univ Hong Kong, Dept Management Sci, Hong Kong, Peoples R China
关键词
Productivity measurement; Productivity improvement; Public construction project; Constant-elasticity-of-substitution function; PERFORMANCE-MEASUREMENT; MANAGEMENT; FRAMEWORK;
D O I
10.1061/(ASCE)CO.1943-7862.0002282
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Large-scale public construction projects often become expensive white elephants requiring considerable postconstruction maintenance. Thus there is a pressing need to integrate construction and postconstruction stages into productivity measurement and analysis. However, previous studies of productivity measurement focused on the efficiency of the project delivery phase, but overlooked the utilization of the constructed facility. This paper developed a two-stage construction project productivity (CPP) measurement model by integrating site efficiency (SE) and utilization effectiveness to investigate strategies for improving the overall CPP. An as-usual setting, which delineates the measurement of CPP, was developed as the benchmark model. Given the relative nature of the productivity concept, two scenarios were considered for CPP improvement. The enhancement scenario was introduced by adding a requirement that CPP is enhanced compared with that in the benchmark model. Then a transcendence scenario was developed to ensure that CPP is better than SE. Strategies for CPP improvement were formulated and were analyzed using the analytical models developed. This study for the first time distinguished the substitutionarity and complementarity between facility occupation and facility management in the postconstruction stage, and claims that the opposite natures offer opposite strategies for CPP improvement. The empirical analysis revealed the law of diminishing marginal utility of facility management. This paper contributes to the body of knowledge by extending the productivity measurement model from the construction stage only to the integration of the construction and postconstruction stages, and by offering two productivity improvement scenarios for strategy formulation. Methodologically, this paper offers a two-stage productivity measurement model and its improvement models in a mathematical way. Managerially, based on the developed models, this work offers the evidence and quantitative guidance for the policy makers and public clients to strategically improve CPP of public projects.
引用
收藏
页数:12
相关论文
共 50 条
  • [21] Research on Effective Public Participation Mechanism in the Decision of Large Public Construction Projects
    Pang Yongshi
    Xie Shufeng
    Wang Yibin
    PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2008, : 24 - 28
  • [22] A bottom-up approach for productivity measurement and improvement
    Jagoda, Kalinga
    Lonseth, Robert
    Lonseth, Adam
    INTERNATIONAL JOURNAL OF PRODUCTIVITY AND PERFORMANCE MANAGEMENT, 2013, 62 (04) : 387 - 406
  • [23] Pathways for the Improvement of Construction Productivity: A Perspective on the Adoption of Advanced Techniques
    Ghasemi Poor Sabet, Pejman
    Chong, Heap-Yih
    ADVANCES IN CIVIL ENGINEERING, 2020, 2020
  • [24] Applications of augmented reality for construction productivity improvement: a systematic review
    Adebowale, Oluseyi Julius
    Agumba, Justus Ngala
    SMART AND SUSTAINABLE BUILT ENVIRONMENT, 2024, 13 (03) : 479 - 495
  • [25] Public participation performance in public construction projects of South China: A case study of the Guangzhou Games venues construction
    Xie, Lin-lin
    Xia, Bo
    Hu, Yi
    Shan, Ming
    Le, Yun
    Chan, Albert P. C.
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2017, 35 (07) : 1391 - 1401
  • [26] Impact of critical factors within decision making process of public engagement and public consultation for construction projects - case studies
    Yu, Jingyu
    Leung, Mei-yung
    Jiang, Xiaoyan
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (12) : 2290 - 2299
  • [27] Health and Safety Consideration in the Procurement of Public Construction Projects in Ghana
    Boadu, Elijah Frimpong
    Sunindijo, Riza Yosia
    Wang, Cynthia Changxin
    BUILDINGS, 2021, 11 (03)
  • [28] The Design of Evaluation Indicators for Management of Public Facilities Construction Projects
    Chen Ling
    Zhang Wenqi
    PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2008, : 208 - 210
  • [29] Structural Stakeholder Model in Public Engagement for Construction Development Projects
    Yu, Jingyu
    Leung, Mei-yung
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2018, 144 (06)
  • [30] Fair Practice Evaluation Model for Public Construction Projects: Focusing on the Korean Construction Market
    Kim, Minju
    Lee, Chanwoo
    Kim, Han Soo
    Cho, Hunhee
    Kim, Sangbum
    Son, JeongWook
    KSCE JOURNAL OF CIVIL ENGINEERING, 2021, 25 (10) : 3620 - 3635