Experimental Study on the Long-Term Behaviour of RBPC T-Beams

被引:8
作者
Cao, Guohui [1 ]
Zhang, Wang [2 ]
Hu, Jiaxing [3 ]
Zhang, Kai [1 ]
机构
[1] Hunan City Univ, Coll Civil Engn, 518 Yingbin East RD, Yiyang 413000, Hunan, Peoples R China
[2] Changsha Univ Sci & Technol, Coll Civil Engn & Architecture, 960,2nd Sect,Wanjiali South RD, Changsha 410114, Hunan, Peoples R China
[3] Hunan Univ, Coll Civil Engn, Lushan South RD, Changsha 410082, Hunan, Peoples R China
基金
中国国家自然科学基金;
关键词
Retard-bonded; Prestressed concrete; Beams and girders; Deflection; Creep; CONCRETE; MODEL;
D O I
10.1007/s40999-017-0227-2
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This study compares the mechanical properties of the retard-bonded and conventionally bonded prestressed concrete (RBPC and BPC, respectively) under uniform loads. Results show that the prestressed strands and concrete of the RBPC T-beams are firmly bonded with harden of retard-bonded materials, thereby exhibiting the same mechanical properties as that of the BPC beams. The growth rate of the long-term deflections of the RBPC T-beam is slightly lower than that of the BPC T-beam. Given the effect of concrete shrinkage, creep and time variation of prestress loss, the regular patterns of deflection growth of the RBPC T-beam mid-spans are analysed based on the age-adjusted effective modulus method, method of equivalent prestress load and calculation model of prestress loss. Accordingly, the long-term deflection development curves of the RBPC T-beam mid-spans under self-weight, prestressing force and external loads are obtained. Calculation results are in good agreement with the test results. This method has immense applicability for the computation of the RBPC T-beams, and can be used to estimate the long-term deflection growth of regular patterns of the RBPC components.
引用
收藏
页码:887 / 895
页数:9
相关论文
共 24 条
[1]  
[Anonymous], 2002, 500812002 GBT MIN HO
[2]   Coupling model for calculating prestress loss caused by relaxation loss, shrinkage, and creep of concrete [J].
Cao Guo-hui ;
Hu Jia-xing ;
Zhang Kai .
JOURNAL OF CENTRAL SOUTH UNIVERSITY, 2016, 23 (02) :470-478
[3]   Ultimate bearing capacity test of retard-bonded prestressed concrete T-beams [J].
Cao, Guo-hui ;
Hu, Jia-xing ;
Xiao, Ming ;
Zhang, Kai .
ADVANCES IN CIVIL ENGINEERING II, PTS 1-4, 2013, 256-259 :769-774
[4]  
[范蕴蕴 Fan Yunyun], 2008, [工业建筑, Industrial Construction], V38, P6
[5]   Experimental Research on Crack Width of Retard-bonded Partially Prestressed Concrete Beams [J].
Feng, Xin ;
Zhou, Xianyan .
ADVANCES IN CIVIL INFRASTRUCTURE ENGINEERING, PTS 1 AND 2, 2013, 639-640 :211-215
[6]   Experimental Study on the Stress Increment of Prestressed Tendons of Retard-Bonded Prestressed Concrete Continuous Beams [J].
Fu, Qiang ;
Cao, Xia ;
Jin, Lingzhi ;
Zhu, Wanxu ;
Yang, Huixian ;
Shu, Zhubai .
ADVANCES IN STRUCTURES, PTS 1-5, 2011, 163-167 :1431-+
[7]  
General Administration of Quality Supervision Inspection and Quarantine of The People's Republic of China, 1998, 29751998 GBT GEN ADM
[8]   Long-term deflection prediction of concrete members reinforced with glass fibre reinforced polymer bars [J].
Hall, T ;
Ghali, A .
CANADIAN JOURNAL OF CIVIL ENGINEERING, 2000, 27 (05) :890-898
[9]  
Inspection and Quarantine of The People's Republic of China, 2010, 22812010 GBT GEN ADM
[10]  
International Federation for Structural Concrete, 1993, CEB FIP MOD COD 1990