Digital Twin and Cloud BIM-XR Platform Development: From Scan-to-BIM-to-DT Process to a 4D Multi-User Live App to Improve Building Comfort, Efficiency and Costs

被引:28
作者
Banfi, Fabrizio [1 ]
Brumana, Raffaella [1 ]
Salvalai, Graziano [2 ]
Previtali, Mattia [1 ]
机构
[1] Politecn Milan, GIcarus ABCLab, Dept Architecture Built Environm & Construct Engn, Via Ponzio 31, I-20133 Milan, Italy
[2] Politecn Milan, RE3 Lab, Dept Architecture Built Environm & Construct Engn, Via Ponzio 31, I-20133 Milan, Italy
关键词
scan-to-BIM; extended reality; live app; cloud-based BIM platform; API; MANAGEMENT; IMPACT; INTEGRATION; REVOLUTION; FRAMEWORK; PROJECT;
D O I
10.3390/en15124497
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Digital twins (DTs) and building information modelling (BIM) are proving to be valuable tools for managing the entire life cycle of a building (LCB), from the early design stages to management and maintenance over time. On the other hand, BIM platforms cannot manage the geometric complexities of existing buildings and the large amount of information that sensors can collect. For this reason, this research proposes a scan-to-BIM process capable of managing high levels of detail (LODs) and information (LOIs) during the design, construction site management, and construction phases. Specific grades of generation (GOGs) were applied to create as-found, as-designed, and as-built models that interact with and support the rehabilitation project of a multi-level residential building. Furthermore, thanks to the sharing of specific APIs (Revit and Autodesk Forge APIs), it was possible to switch from static representations to novel levels of interoperability and interactivity for the user and more advanced forms of building management such as a DT, a BIM cloud, and an extended reality (XR) web platform. Finally, the development of a live app shows how different types of users (professionals and non-expert) can interact with the DT, in order to know the characteristics with which the environments have been designed, as well as the environmental parameters, increasing their degree of control, from the point of view of improving comfort, use, costs, behaviour, and good practices. Finally, the overall approach was verified through a real case study where the BIM-XR platform was built for energy improvements to existing buildings and facade renovations.
引用
收藏
页数:26
相关论文
共 85 条
  • [1] Afsari K., 2016, ISARC P INT S AUTOMA, P1
  • [2] Barriers to Digital Technology Deployment in Value Management Practice
    Aghimien, Douglas
    Ngcobo, Ntebo
    Aigbavboa, Clinton
    Dixit, Saurav
    Vatin, Nikolai Ivanovich
    Kampani, Shivani
    Khera, Gurbir Singh
    [J]. BUILDINGS, 2022, 12 (06)
  • [3] BIM-based techno-economic assessment of energy retrofitting residential buildings in hot humid climate
    Ahmed, Wahhaj
    Asif, Muhammad
    [J]. ENERGY AND BUILDINGS, 2020, 227
  • [4] Salvaging building materials in a circular economy: A BIM-based whole-life performance estimator
    Akanbi, Lukman A.
    Oyedele, Lukumon O.
    Akinade, Olugbenga O.
    Ajayi, Anuoluwapo O.
    Delgado, Manuel Davila
    Bilal, Muhammad
    Bello, Sururah A.
    [J]. RESOURCES CONSERVATION AND RECYCLING, 2018, 129 : 175 - 186
  • [5] BIM-Based End-of-Lifecycle Decision Making and Digital Deconstruction: Literature Review
    Akbarieh, Arghavan
    Jayasinghe, Laddu Bhagya
    Waldmann, Daniele
    Teferle, Felix Norman
    [J]. SUSTAINABILITY, 2020, 12 (07)
  • [6] From BIM to extended reality in AEC industry
    Alizadehsalehi, Sepehr
    Hadavi, Ahmad
    Huang, Joseph Chuenhuei
    [J]. AUTOMATION IN CONSTRUCTION, 2020, 116
  • [7] Investigating Approaches of Integrating BIM, IoT, and Facility Management for Renovating Existing Buildings: A Review
    Altohami, Abubaker Basheer Abdalwhab
    Haron, Nuzul Azam
    Alias, Aidi Hizami Ales
    Law, Teik Hua
    [J]. SUSTAINABILITY, 2021, 13 (07)
  • [8] Framework for Computerizing the Processes of a Job and Automating the Operational Management on Site-A Case Study of Demolition and Reconstruction Construction Site
    Amici, Caterina
    Rotilio, Marianna
    De Berardinis, Pierluigi
    Cucchiella, Federica
    [J]. BUILDINGS, 2022, 12 (06)
  • [9] [Anonymous], 2012, Directive of the European Parliament and of the Council
  • [10] [Anonymous], 2010, Regulation no 517/2014 of the European parliament and of the council of 16 april 2014 on fluorinated greenhouse gases and repealing regulation (ec) no 842/2006, V276, P33