A State-of-the-Art Review on Meta-heuristics Application in Remanufacturing

被引:15
作者
Ansari, Zulfiquar N. [1 ,2 ]
Daxini, Sachin D. [1 ,2 ]
机构
[1] Babaria Inst Technol, Dept Mech Engn, Vadodara 391240, Gujarat, India
[2] Gujarat Technol Univ, Ahmadabad, Gujarat, India
关键词
Remanufacturing; Supply chain; Meta-heuristics; Review; Optimization; LOT-SIZING PROBLEM; REVERSE LOGISTICS NETWORK; LOOP SUPPLY CHAIN; SEQUENCE-DEPENDENT SETUPS; ANT COLONY OPTIMIZATION; GENETIC ALGORITHM; DISASSEMBLY LINE; PRODUCT RETURNS; ELECTRONIC EQUIPMENT; TABU SEARCH;
D O I
10.1007/s11831-021-09580-z
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The objective of this study is to present a state-of-the-art review on applications and trends of meta-heuristics for remanufacturing problems. This literature review mainly encompass the most popular and frequently employed meta-heuristics like genetic algorithm, artificial bee colony, particle swarm optimization, ant colony optimization, simulated annealing, tabu search, variable neighborhood search and the hybrid of these approaches. By adopting a systematic procedure consisting of article collection and article selection, this research work selected 123 articles for literature analysis. The selected literature is categorized based on the application area of the remanufacturing problem; meta-heuristics techniques i.e. individual or hybrid meta-heuristics used; and mathematical models objective type (single or multi-objective models); objective function types based on the sustainable dimension (economic, social or environmental objective); objective functions such as minimize cost/time, maximize profit, etc. considered in a single and multi-objective models. Based on the analysis it is found that production planning and scheduling is the most focused application area of remanufacturing followed with reverse logistics. Further, GA is the most popular individual meta-heuristics used for optimization of the problem. The analysis also finds that hybrid meta-heuristics have gained increased attention in the past few years. The majority of the remanufacturing optimization models considered single objective. The present study also suggests several research avenues for further investigation.
引用
收藏
页码:427 / 470
页数:44
相关论文
共 158 条
[1]   Quantitative models for inventory and production planning in closed-loop supply chains [J].
Akcali, E. ;
Cetinkaya, S. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (08) :2373-2407
[2]   A Genetic Algorithm for Reverse Logistics network design: A case study from the GCC [J].
Alshamsi, Ahmed ;
Diabat, Ali .
JOURNAL OF CLEANER PRODUCTION, 2017, 151 :652-669
[3]  
[Anonymous], 2012, PROD PLAN CONTROL, DOI DOI 10.1080/09537287.2011.561815
[4]   Evaluation and ranking of solutions to mitigate sustainable remanufacturing supply chain risks: a hybrid fuzzy SWARA-fuzzy COPRAS framework approach [J].
Ansari, Zulfiquar N. ;
Kant, Ravi ;
Shankar, Ravi .
INTERNATIONAL JOURNAL OF SUSTAINABLE ENGINEERING, 2020, 13 (06) :473-494
[5]   Coordination of the closed-loop supply chain for product line design with consideration of remanufactured products [J].
Aydin, R. ;
Kwong, C. K. ;
Ji, P. .
JOURNAL OF CLEANER PRODUCTION, 2016, 114 :286-298
[6]   A novel methodology for simultaneous consideration of remanufactured and new products in product line design [J].
Aydin, R. ;
Kwong, C. K. ;
Ji, P. .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2015, 169 :127-140
[7]  
Azadeh Ali, 2013, International Journal of Logistics Systems and Management, V16, P67
[8]   A multiple lifecycle-based approach to sustainable product configuration design [J].
Badurdeen, Fazleena ;
Aydin, Ridvan ;
Brown, Adam .
JOURNAL OF CLEANER PRODUCTION, 2018, 200 :756-769
[9]  
Benaissa M., 2018, ARCH TRANSP, V47, P7, DOI [10.5604/01.3001.0012.6503, DOI 10.5604/01.3001.0012.6503]
[10]   Preventive remanufacturing planning of production equipment under operational and imperfect maintenance constraints: A hybrid genetic algorithm based approach [J].
Bensmain, Yassir ;
Dahane, Mohammed ;
Bennekrouf, Mohammed ;
Sari, Zaki .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 2019, 185 :546-566