Material Requirement Planning with fuzzy constraints and fuzzy coefficients

被引:92
作者
Mula, J. [1 ]
Poler, R.
Garcia-Sabater, J. P.
机构
[1] Univ Polytecn Valencia, CIGIP Res Ctr Prod Management & Engn, Valencia, Spain
[2] Univ Polytecn Valencia, Business Management Dept, Valencia, Spain
关键词
fuzzy mathematical programming; MRP; uncertainty; fuzzy constraints; fuzzy coefficients;
D O I
10.1016/j.fss.2006.11.003
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
We propose a new fuzzy mathematical programming model for production planning under uncertainty in an industrial environment. This model considers fuzzy constraints related to the total costs, the market demand and the available capacity of the productive resources and fuzzy coefficients for the costs due to the backlog of demand and for the required capacity. The main goal is to determine the master production schedule of each product, the MRP (Material Requirement Planning) for each raw component in each period, stock levels, demand backlog, and capacity usage levels over a given planning horizon. Finally, the proposed model is tested by using data from an automobile seat assembler and compared with other fuzzy mathematical programming approaches. The experiment shows that the proposed model has not got a better behaviour than more simple fuzzy models, but the advantage is that both types of uncertainties, fuzziness and lack of knowledge or epistemic uncertainty can be considered in a model with fuzzy constraints and fuzzy coefficients. (C) 2006 Elsevier B.V. All rights reserved.
引用
收藏
页码:783 / 793
页数:11
相关论文
共 48 条
[1]  
[Anonymous], 1988, POSSIBILITY THEORY A
[2]  
BELLMAN RE, 1970, MANAGE SCI B-APPL, V17, pB141
[3]  
*CPLEX OPT INC, 1994, US CPLEX CALL LIB
[4]   Nervousness in inventory management: Comparison of basic control rules [J].
deKok, T ;
Inderfurth, K .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 103 (01) :55-82
[5]   A GENERAL-MODEL FOR FUZZY LINEAR-PROGRAMMING [J].
DELGADO, M ;
VERDEGAY, JL ;
VILA, MA .
FUZZY SETS AND SYSTEMS, 1989, 29 (01) :21-29
[6]   RELATING DIFFERENT APPROACHES TO SOLVE LINEAR-PROGRAMMING PROBLEMS WITH IMPRECISE COSTS [J].
DELGADO, M ;
VERDEGAY, JL ;
VILA, MA .
FUZZY SETS AND SYSTEMS, 1990, 37 (01) :33-42
[7]  
Delgado M., 1994, Fuzzy optimization: Recent advances
[8]   Fuzzy scheduling: Modelling flexible constraints vs. coping with incomplete knowledge [J].
Dubois, D ;
Fargier, H ;
Fortemps, P .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2003, 147 (02) :231-252
[9]  
Dubois D., 1980, FUZZY SET SYST
[10]  
Escudero L. F., 1993, Annals of Operations Research, V43, P311