Identifying and prioritizing foreign companies interested in participating in post-sanctions Iranian energy sector

被引:10
作者
Bonyani, Abbas [1 ]
Alimohammadlou, Moslem [2 ]
机构
[1] Allameh Tabatabai Univ, Fac Management & Accounting, Dept Ind Management, Tehran, Iran
[2] Shiraz Univ, Fac Econ Management & Social Sci, Dept Management, Shiraz, Iran
关键词
Iran; Post-sanctions; Energy sector; Petrochemical industry; DECISION-MAKING METHOD; CONTRACTOR PREQUALIFICATION; MAINTENANCE CONTRACTORS; SUPPLIER SELECTION; MULTIPLE CRITERIA; PROMETHEE METHOD; MODEL; TECHNOLOGY; MANAGEMENT; PROJECTS;
D O I
10.1016/j.esr.2018.05.008
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Ever since the sanctions on economic and financial cooperation with Iran have been lifted, leading contractors in the field of energy have expressed their interest in participating in Iran's energy sector. This study sought to propose a model for assessing and ranking foreign companies willing to take an active part in the Iranian petrochemical industry. To accomplish this, an integrated model composed of Best-Worst Method, ELECTRE III and PROMETHEE II was proposed. More specifically, to weight the criteria, Best-Worst Method was used, and to evaluate and rank them, ELECTRE and PROMETHEE methods were utilized. The data were gathered through questionnaires which collected the opinions of 8 experts in the field of the Iranian petrochemical industry. Results of data analysis revealed that in final evaluation, some well-known European companies in this area had higher positions compared to the others and those which cooperated with Iran during the sanctions.
引用
收藏
页码:180 / 190
页数:11
相关论文
共 64 条
[1]   Performance modeling for contractor selection [J].
Alarcón, LF ;
Mourgues, C .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2002, 18 (02) :52-60
[2]  
Alzahrani J. I., 2012, INT J PROJ MANAG, V28, P1
[3]  
Anagnostopoulos K.P., 2006, Operational Research, Springer, V6, P333, DOI DOI 10.1007/BF02941261
[4]  
[Anonymous], 2016, WORLD SCI NEWS
[5]  
[Anonymous], 2015, MIDDLE E N AFRICA Q
[6]  
[Anonymous], 2015, INT MED GAS OIL C AP, DOI DOI 10.1109/MEDGO.2015.7330322
[7]   A decision support system for contractor prequalification for surety bonding [J].
Awad, Adel ;
Fayek, Aminah Robinson .
AUTOMATION IN CONSTRUCTION, 2012, 21 :89-98
[8]  
Barry M-L, 2009, JCMAN, V6, P229
[9]   HOW TO SELECT AND HOW TO RANK PROJECTS - THE PROMETHEE METHOD [J].
BRANS, JP ;
VINCKE, P ;
MARESCHAL, B .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1986, 24 (02) :228-238
[10]   A PREFERENCE RANKING ORGANIZATION METHOD - (THE PROMETHEE METHOD FOR MULTIPLE CRITERIA DECISION-MAKING) [J].
BRANS, JP ;
VINCKE, PH .
MANAGEMENT SCIENCE, 1985, 31 (06) :647-656