共 60 条
[1]
Abidali A.F., 1995, CONSTR MANAG ECON, V13, P189, DOI DOI 10.1080/01446199500000023
[2]
[Anonymous], CONSTR MANAGE EC
[3]
Chinyio E.A., 1998, CONSTRUCTION MANAGEM, V16, P91, DOI DOI 10.1080/014461998372628
[4]
*CIB WORK GROUP 3, 1997, COD PRACT SEL MAIN C
[5]
*CIC, 1993, PROC PROF SERV GUID
[6]
*CIDA, 1995, PREQ CRIT AUSTR CONS
[7]
*CIRIA, 1998, SEL CONTR BY VAL
[8]
COST-PLUS CONTRACTOR SELECTION - AN ANALYTICAL METHOD
[J].
ENGINEERING COSTS AND PRODUCTION ECONOMICS,
1983, 7 (02)
:147-158
[9]
DIEKMANN JE, 1994, SOURCE DOCUMENTS, V101
[10]
Egan J., 1998, RETHINKING CONSTRUCT