A two-stage stochastic programming approach for multi-activity tour scheduling

被引:20
|
作者
Restrepo, Maria I. [1 ,2 ]
Gendron, Bernard [1 ,3 ]
Rousseau, Louis-Martin [1 ,2 ]
机构
[1] CIRRELT, Montreal, PQ H3T 1J4, Canada
[2] Polytech Montreal, Dept Math & Genie Ind, Montreal, PQ H3C 3A7, Canada
[3] Univ Montreal, Dept Informat & Rech Operat, Montreal, PQ H3C 3J7, Canada
关键词
Scheduling; Stochastic multi-activity tour scheduling problem; Two-stage stochastic programming model; L-shaped method; Context-free grammars; COLUMN GENERATION; ALGORITHM; MODEL;
D O I
10.1016/j.ejor.2017.04.055
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper addresses a discontinuous multi-activity tour scheduling problem under demand uncertainty and when employees have identical skills. The problem is formulated as a two-stage stochastic programming model, where first-stage decisions correspond to the assignment of employees to weekly tours, while second-stage decisions are related to the allocation of work activities and breaks to daily shifts. A multi-cut L-shaped method is presented as a solution approach. Computational results on real-based and randomly generated instances show that the use of the stochastic model helps to reduce understaffing and overstaffing costs, when compared with the expected-value problem solutions. (C) 2017 Elsevier B.V. All rights reserved.
引用
收藏
页码:620 / 635
页数:16
相关论文
共 50 条
  • [1] A two-stage stochastic programming project scheduling approach to production planning
    Alfieri, Arianna
    Tolio, Tullio
    Urgo, Marcello
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 62 (1-4): : 279 - 290
  • [2] A two-stage stochastic programming project scheduling approach to production planning
    Arianna Alfieri
    Tullio Tolio
    Marcello Urgo
    The International Journal of Advanced Manufacturing Technology, 2012, 62 : 279 - 290
  • [3] Optimal Nursing Home Shift Scheduling: A Two-Stage Stochastic Programming Approach
    Jiang, Shujin
    Li, Mingyang
    Hyer, Kathryn
    Kong, Nan
    2020 IEEE 16TH INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING (CASE), 2020, : 132 - 137
  • [4] Appointment Scheduling at Outpatient Clinics Using Two-Stage Stochastic Programming Approach
    Anvaryazdi, Samira Fazel
    Venkatachalam, Saravanan
    Chinnam, Ratna Babu
    IEEE ACCESS, 2020, 8 : 175297 - 175305
  • [5] A Two-stage Stochastic Programming Model for Outpatient Appointment Scheduling
    Ma Shuang
    Chen Songlin
    Cai Xiaotian
    2019 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2019, : 79 - 83
  • [6] A two-stage stochastic programming approach to employee scheduling in retail outlets with uncertain demand
    Parisio, Alessandra
    Jones, Colin Neil
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2015, 53 : 97 - 103
  • [7] A two-stage stochastic programming approach for generation and transmission maintenance scheduling with risk management
    Fan, Aoyu
    Huang, Zhouchun
    Zheng, Qipeng
    Luo, Xiaodong
    COMPUTATIONAL OPTIMIZATION AND APPLICATIONS, 2024,
  • [8] A Two-stage Stochastic Programming Approach for Operating Multi-energy system
    Zeng, Qing
    Fang, Jiakun
    Chen, Zhe
    Conejo, Antonio J.
    2017 IEEE CONFERENCE ON ENERGY INTERNET AND ENERGY SYSTEM INTEGRATION (EI2), 2017,
  • [9] Optimal scheduling of smart home appliances with a stochastic power outage: A two-stage stochastic programming approach
    Malekkhani, Zahra
    Ranjbar, Mohammad
    SUSTAINABLE ENERGY GRIDS & NETWORKS, 2024, 40
  • [10] A two-stage heuristic for multi-activity and task assignment to work shifts
    Lequy, Quentin
    Desaulniers, Guy
    Solomon, Marius M.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2012, 63 (04) : 831 - 841