Flow shop optimization of hybrid make-to-order and make-to-stock in precast concrete component production

被引:41
作者
Jiang, Wen [1 ]
Wu, Lanjun [1 ]
机构
[1] Sichuan Agr Univ, Coll Architecture & Urban Rural Planning, Chengdu 611830, Peoples R China
基金
中国国家自然科学基金;
关键词
Hybrid MTO-MTS; Flow shop scheduling; Minimizing total tardiness and earliness; Precast component; MINIMIZE TOTAL EARLINESS; PREFABRICATED CONSTRUCTION; MULTIPLE PRODUCTION; HONG-KONG; M-MACHINE; ALGORITHM; HEURISTICS; SYSTEMS; MANAGEMENT; TARDINESS;
D O I
10.1016/j.jclepro.2021.126708
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
As the world environment is faced with the severe challenge of global warming, prefabricated construction is the path for the construction industry towards green production. Precast component manufacturers produce standardized and non-standardized components simultaneously. Non-standard components are produced make-to-order (MTO). Standard components are produced make-to-stock (MTS). In this study, the flow shop precast component production scheduling problem under a hybrid MTO-MTS environment is studied. A hybrid MTO-MTS precast component flow shop production model is developed. The object is to minimize total tardiness and earliness of delivery. An iterative job insertion algorithm based on whale optimization is developed. The proposed method involves two stages: scheduling and insertion. The first is to optimize the scheduling of customized MTO components. Then the standard MTS job is inserted. Through the computational evaluation, the performance and effect of the proposed approach are tested. It can conclude that the proposed algorithm contributes to the effective and efficient optimization of Hybrid MTO-MTS precast component production. (c) 2021 Elsevier Ltd. All rights reserved.
引用
收藏
页数:11
相关论文
共 52 条
[1]   RETRACTED: A hybrid whale optimization algorithm based on local search strategy for the permutation flow shop scheduling problem (Retracted article. See vol. 128, pg. 567, 2022) [J].
Abdel-Basset, Mohamed ;
Manogaran, Gunasekaran ;
El-Shahat, Doaa ;
Mirjalili, Seyedali .
FUTURE GENERATION COMPUTER SYSTEMS-THE INTERNATIONAL JOURNAL OF ESCIENCE, 2018, 85 :129-145
[2]   A comparison of make-to-stock and make-to-order in multi-product manufacturing systems with variable due dates [J].
Altendorfer, Klaus ;
Minner, Stefan .
IIE TRANSACTIONS, 2014, 46 (03) :197-212
[3]   Flexible lot sizing in hybrid make-to-order/make-to-stock production planning [J].
Beemsterboer, Bart ;
Land, Martin ;
Teunter, Ruud .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2017, 260 (03) :1014-1023
[4]   Integrating make-to-order and make-to-stock in job shop control [J].
Beemsterboer, Bart ;
Land, Martin ;
Teunter, Ruud ;
Bokhorst, Jos .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2017, 185 :1-10
[5]   Hybrid MTO-MTS production planning: An explorative study [J].
Beemsterboer, Bart ;
Land, Martin ;
Teunter, Ruud .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2016, 248 (02) :453-461
[6]   Review of Constructions and Materials Used in Swedish Residential Buildings during the Post-War Peak of Production [J].
Berggren, Bjorn ;
Wall, Maria .
BUILDINGS, 2019, 9 (04)
[7]   Production scheduling for precast plants using a flow shop sequencing model [J].
Chan, WT ;
Hu, H .
JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2002, 16 (03) :165-174
[8]   Queueing analysis on a single-station make-to-stock/make-to-order inventory-production system [J].
Chang, Kuo-Hwa ;
Lu, Yang-Shu .
APPLIED MATHEMATICAL MODELLING, 2010, 34 (04) :978-991
[9]   Heuristic PAC model for hybrid MTO and MTS production environment [J].
Chang, SH ;
Pai, PF ;
Yuan, KJ ;
Wang, BC ;
Li, RK .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2003, 85 (03) :347-358
[10]   The effect of production structure on the total CO2 emissions intensity in the Chinese construction industry [J].
Chen, Jindao ;
Shen, Liyin ;
Shi, Qian ;
Hong, Jingke ;
Ochoa, J. Jorge .
JOURNAL OF CLEANER PRODUCTION, 2019, 213 :1087-1095