Reducing control selection errors associated with underground bolting equipment

被引:7
作者
Burgess-Limerick, Robin [1 ]
Krupenia, Veronica [1 ]
Zupanc, Christine [1 ]
Wallis, Guy [1 ]
Steiner, Lisa [2 ]
机构
[1] Univ Queensland, Sch Human Movement Studies, Brisbane, Qld 4072, Australia
[2] NIOSH, Min Injury Prevent Branch, Pittsburgh Res Lab, Pittsburgh, PA USA
关键词
Equipment design; Shape coding; Simulation; Mining;
D O I
10.1016/j.apergo.2009.11.008
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Selecting the incorrect control during the operation of underground bolting and drilling equipment causes serious injuries. Shape coding and the layout of dual control banks are two aspects of control design which require further examination. The aims of this research were: (i) to determine whether arbitrary shape coding was effective in reducing selection error rates in a virtual analogy of roof-bolting; and (ii) to determine whether any advantages exist for mirror or place layouts for dual control situations in this situation. Two experiments were conducted to address these questions. No benefits of arbitrary shape coding were evident while control location remained constant. When control location was altered, shape coding did provide a significant reduction in selection error rate. No differences between mirror or place arrangements were detected and this question remains open. (C) 2009 Elsevier Ltd. All rights reserved.
引用
收藏
页码:549 / 555
页数:7
相关论文
共 19 条
[1]   Injuries associated with continuous miners, shuttle cars, load-haul-dump and personnel transport in New South Wales underground coal mines [J].
Burgess-Limerick, R. ;
Steiner, L. .
TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY, 2006, 115 (04) :160-168
[2]  
BURGESSLIMERICK R, 2007, MINING ENG OCT
[3]  
CHAPELLE APC, 1899, COMMUNICATION 1226, P50
[4]  
*DEP DEF, 1999, MILSTD147F DEP DEF
[5]  
GILBERT VA, 1990, 891 USBM OFR
[6]  
Helander M., 1980, 17082 USBM OFR
[7]   SAFETY OF ROOF-BOLTING OPERATIONS IN UNDERGROUND COAL-MINES [J].
HELANDER, MG ;
KROHN, GS ;
CURTIN, R .
JOURNAL OF OCCUPATIONAL ACCIDENTS, 1983, 5 (03) :161-175
[8]  
Klishis M. J., 1993, ACCIDENT RISKS ROOF, VVIII
[9]  
MARK C, 2002, 21 INT C GROUND CONT, P150
[10]  
MILLER WK, 1973, 1107 US DEP INT INF