Parallel, Multistage Model for Enterprise System Planning and Design

被引:8
作者
Kim, Harrison M. [1 ]
Lu, Shen [1 ]
Kim, Jin Suk [2 ]
Kim, Byoung-Do [3 ]
机构
[1] Univ Illinois, Dept Ind & Enterprise Syst Engn, Urbana, IL 61801 USA
[2] Univ Seoul, Dept Comp Sci, Seoul, South Korea
[3] Texas Adv Comp Ctr, Austin, TX 78758 USA
来源
IEEE SYSTEMS JOURNAL | 2010年 / 4卷 / 01期
基金
美国国家科学基金会;
关键词
Design; optimization; parallel enterprise system; planning;
D O I
10.1109/JSYST.2009.2039733
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper describes a parallel, multistage optimization approach for enterprise system design and planning where the design of a system is linked with its planing and operations (resource allocation). Our approach is composed of two parts: a multistage formulation and a task-parallel algorithm. The formulation utilizes the quasi-separability of the multistage decision making structure, i.e., allowing relaxation by defining the linking variables for adjacent stages of decision making. The task-parallel algorithm enables optimal load balancing of the tasks, and it is validated in the demonstration case where an airline plans to introduce multiple new aircraft to capture dynamically changing travel demand. A linearly increasing computational load is assumed as the number of stages increases due to the complexity added onto the upcoming future stages in the optimization processes. The proposed task parallel algorithm demonstrates significant speedups and parallel performances by utilizing this linearity.
引用
收藏
页码:6 / 14
页数:9
相关论文
共 50 条
  • [21] Research on the Construction and Optimization Approaches for the Housing Construction Process Control System based on Enterprise Resources Planning System and Data Analysis Model
    Hui, Cao
    [J]. INTERNATIONAL SYMPOSIUM 2018 - MECHANICAL AND ELECTRONICAL SYSTEMS AND CONTROL ENGINEERING, 2018, : 106 - 114
  • [22] Research on the Construction and Optimization Approaches for the Housing Construction Process Control System based on Enterprise Resources Planning System and Data Analysis Model
    Cao Hui
    Chen Chun-Hua
    [J]. INTERNATIONAL SYMPOSIUM 2015: MECHANICAL AND ELECTRONICAL SYSTEMS AND CONTROL ENGINEERING, 2015, : 9 - 14
  • [23] Forecasting enterprise resource planning software effort using evolutionary support vector machine inference model
    Chou, Jui-Sheng
    Cheng, Min-Yuan
    Wu, Yu-Wei
    Wu, Cheng-Chieh
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2012, 30 (08) : 967 - 977
  • [24] Study on the Design and Application of Enterprise Information Management System
    Xu, Youfeng
    [J]. 2013 3RD INTERNATIONAL CONFERENCE ON EDUCATION AND EDUCATION MANAGEMENT (EEM 2013), 2013, 27 : 616 - 620
  • [25] Design and Implementation of ERP System of Garment Production Enterprise
    Zhang, Jihong
    [J]. 2016 3RD INTERNATIONAL CONFERENCE ON ECONOMIC, BUSINESS MANAGEMENT AND EDUCATIONAL INNOVATION (EBMEI 2016), PT 2, 2016, 55 : 743 - 747
  • [26] Enterprise-wide semiconductor manufacturing resource planning
    Stray, Jonas
    Fowler, John W.
    Carlyle, W. Matthew
    Rastogi, Aditya P.
    [J]. IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2006, 19 (02) : 259 - 268
  • [27] Multistage Stochastic Programming (MSP) Model for Carbon Nanotube Production Capacity Expansion Planning
    Erbis, Serkan
    Kamarthi, Sagar
    Cullinane, Thomas P.
    Isaacs, Jacqueline A.
    [J]. ACS SUSTAINABLE CHEMISTRY & ENGINEERING, 2014, 2 (07): : 1633 - 1641
  • [28] A submarine arrangement design program based on the expert system and the multistage optimization
    Kim, Ki-Su
    Roh, Myung-Il
    [J]. ADVANCES IN ENGINEERING SOFTWARE, 2016, 98 : 97 - 111
  • [29] Trajectory Design of a Rocket-Scramjet-Rocket Multistage Launch System
    Forbes-Spyratos, Sholto O.
    Kearney, Michael P.
    Smart, Michael K.
    Jahn, Ingo H.
    [J]. JOURNAL OF SPACECRAFT AND ROCKETS, 2019, 56 (01) : 53 - 67
  • [30] PROBLEM SOLVING OF DESIGN AND PLANNING OF OPEN PIT MINING IN MINEFRAME SYSTEM
    Nagovitsyn, O. V.
    Lukichev, S. V.
    Alisov, A. Yu.
    [J]. JOURNAL OF MINING INSTITUTE, 2012, 198 : 49 - 54