Optimal agereplacement scheduling for a random work system with random leadtime

被引:24
作者
Chang, Chin-Chih [1 ]
机构
[1] Takming Univ Sci & Technol, Dept Chains & Franchising Management, Taipei, Taiwan
关键词
inventory; maintenance; age replacement; random working time; random lead time; optimisation; IMPERFECT PREVENTIVE MAINTENANCE; AGE-REPLACEMENT POLICY; REPAIR-COST LIMIT; SUBJECT; OPTIMIZATION; TIMES; 1ST;
D O I
10.1080/00207543.2018.1425017
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
System maintenance and spare parts are two closely related logistics activities since maintenance generates the demand for spare parts. Most studies on integrated models of preventive replacement and inventory of spare parts have focused on age replacement scheduling, while random replacement policy, which is sensible and necessary in practice, is rarely discussed and applied. The purpose of this paper is to present a generalised age replacement policy for a system which works at random time and considers random lead time for replacement delivery. To model an imperfect maintenance action, we consider that the system undergoes minimal repairs at minor failures and corrective replacements at catastrophic failures. Before catastrophic failures, the system is replaced preventively at age T or at the completion of a working time, whichever occurs first. The main objective is to determine an optimal schedule of age replacement that minimises the mean cost rate function of the system in a finite time horizon. The existence and uniqueness of optimal replacement policy are derived analytically and computed numerically. It can be seen that the proposed model is a generalisation of the previous works in maintenance theory.
引用
收藏
页码:5511 / 5521
页数:11
相关论文
共 30 条
[1]   OPTIMUM PREVENTIVE MAINTENANCE POLICIES [J].
BARLOW, R ;
HUNTER, L .
OPERATIONS RESEARCH, 1960, 8 (01) :90-100
[2]  
BEICHELT F, 1993, NAV RES LOG, V40, P51, DOI 10.1002/1520-6750(199302)40:1<51::AID-NAV3220400104>3.0.CO
[3]  
2-V
[4]   Optimal imperfect preventive maintenance policy for equipment leased during successive periods [J].
Ben Mabrouk, A. ;
Chelbi, A. ;
Radhoui, M. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2016, 54 (17) :5095-5110
[5]  
BERG M, 1982, INFOR, V20, P258
[6]   IMPERFECT REPAIR [J].
BROWN, M ;
PROSCHAN, F .
JOURNAL OF APPLIED PROBABILITY, 1983, 20 (04) :851-859
[7]   Optimal preventive policies for imperfect maintenance models with replacement first and last [J].
Chang, C. C. .
COMMUNICATIONS IN STATISTICS-THEORY AND METHODS, 2016, 45 (17) :5123-5136
[8]   Optimum preventive maintenance policies for systems subject to random working times, replacement, and minimal repair [J].
Chang, Chin-Chih .
COMPUTERS & INDUSTRIAL ENGINEERING, 2014, 67 :185-194
[9]   Optimal number of minimal repairs before replacement based on a cumulative repair-cost limit policy [J].
Chang, Chin-Chih ;
Sheu, Shey-Huei ;
Chen, Yen-Luan .
COMPUTERS & INDUSTRIAL ENGINEERING, 2010, 59 (04) :603-610
[10]   RANDOM AND AGE REPLACEMENT POLICIES [J].
Chen, Mingchih ;
Mizutani, Satoshi ;
Nakagawa, Toshio .
INTERNATIONAL JOURNAL OF RELIABILITY QUALITY AND SAFETY ENGINEERING, 2010, 17 (01) :27-39