Influence of Different Excavation Sequence of Double-Side Heading Method on Supporting Structure

被引:1
作者
Ling, Chengkun [1 ]
Ruan, Yanmei [2 ]
Wu, Pengbo [1 ]
Li, Jin [1 ]
Zhao, Jin [3 ]
Yuan, Bingxiang [3 ]
机构
[1] China Railway Tenth Bur Grp, Urban Rail Transit Engn Co Ltd, Guangzhou 510000, Guangdong, Peoples R China
[2] Guangzhou Metro Design & Res Inst Co Ltd, Guangzhou 510030, Guangdong, Peoples R China
[3] Guangdong Univ Technol, Sch Civil & Transportat Engn, Guangzhou 510006, Guangdong, Peoples R China
基金
中国国家自然科学基金;
关键词
PERFORMANCE;
D O I
10.1155/2022/2258594
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The double-side heading method is often used in the construction of large-span and large-section tunnels. The excavation of the pilot tunnel is complex, so the construction efficiency is low. Based on the underground excavation tunnel project of a subway in Guangzhou, the section excavation sequence of the traditional double-side heading method is optimized according to the actual situation. Midas/GTS software is used for finite element analysis, the displacement and internal force of ground settlement and support structure under two different section excavation sequences are calculated, and the calculation results are compared with the field monitoring data. The calculation results show that the influence of the two excavation sequences on the displacement of the supporting structure is not much different, but the influence on the internal force of the supporting structure is obviously different. The stress value of the supporting structure caused by the optimized excavation sequence is larger, especially the temporary inverted arch, but it is within the controllable range. The optimized excavation sequence increases the construction work surface, greatly improves the construction efficiency, and reduces the project cost, which can provide a reference for the construction of urban subway tunnels under similar engineering conditions in the future.
引用
收藏
页数:13
相关论文
共 43 条
  • [1] Coupled thermo-hydro-mechanical mechanism in view of the soil particle rearrangement of granular thermodynamics
    Bai, Bing
    Zhou, Rui
    Cai, Guoqing
    Hu, Wei
    Yang, Guangchang
    [J]. COMPUTERS AND GEOTECHNICS, 2021, 137
  • [2] Cotransport of heavy metals and SiO2 particles at different temperatures by seepage
    Bai, Bing
    Nie, Qingke
    Zhang, Yike
    Wang, Xiaolong
    Hu, Wei
    [J]. JOURNAL OF HYDROLOGY, 2021, 597
  • [3] Deng W., 2018, HIGHWAY, V63, P253
  • [4] Experimental study on dynamic split tensile properties of rubber concrete
    Feng, Wanhui
    Liu, Feng
    Yang, Fei
    Li, Lijuan
    Jing, Lin
    [J]. CONSTRUCTION AND BUILDING MATERIALS, 2018, 165 : 675 - 687
  • [5] Behavior of concrete-filled FRP tube columns internally reinforced with FRP-steel composite bars under axial compression
    Guo, Yong-Chang
    Xiao, Shu-Hua
    Zeng, Jun-Jie
    Su, Jia-Ying
    Li, Tian-Zi
    Xie, Zhi-Hong
    [J]. CONSTRUCTION AND BUILDING MATERIALS, 2022, 315
  • [6] Effective usage of high strength steel tubes: Axial compressive behavior of hybrid FRP-concrete-steel solid columns
    Guo, Yong-Chang
    Ye, Yu-Yi
    Guan-Lin
    Lv, Jun-Fan
    Bai, Yu-Lei
    Zeng, Jun-Jie
    [J]. THIN-WALLED STRUCTURES, 2020, 154
  • [7] Utilization of unprocessed steel slag as fine aggregate in normal- and high-strength concrete
    Guo, Yongchang
    Xie, Jianhe
    Zhao, Jianbai
    Zuo, Kexian
    [J]. CONSTRUCTION AND BUILDING MATERIALS, 2019, 204 : 41 - 49
  • [8] Advance numerical simulation of tunneling by using a double shield TBM
    Hasanpour, Rohola
    [J]. COMPUTERS AND GEOTECHNICS, 2014, 57 : 37 - 52
  • [9] Li S.T., 2017, CHINA CIVIL ENG J, V50, P292
  • [10] Li X.D., 2015, TUNN CONSTR, V35, P1060