Optimal single-machine batch scheduling for the manufacture, transportation and JIT assembly of precast construction with changeover costs within due dates

被引:52
|
作者
Kong, Liulin [1 ,2 ]
Li, Heng [2 ]
Luo, Hanbin [1 ]
Ding, Lieyun [1 ]
Luo, Xiaochun [2 ]
Skitmore, Martin [3 ]
机构
[1] Huazhong Univ Sci & Technol, Sch Civil Engn & Mech, Wuhan, Peoples R China
[2] Hong Kong Polytech Univ, Dept Bldg & Real Estate, Hong Kong, Hong Kong, Peoples R China
[3] Queensland Univ Technol, Sch Civil Engn & Built Environm, Brisbane, Qld, Australia
基金
中国国家自然科学基金;
关键词
Precast construction; Just-In-Time (JIT) assembly; Single machine batch scheduling; Changeover cost; COMMON; OPTIMIZATION; ASSIGNMENT; TARDINESS; EARLINESS; MINIMIZE;
D O I
10.1016/j.autcon.2017.03.016
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The manufacture, transportation and on-site assembly sectors of precast construction projects are often considered separately and managed by rule of thumb, causing an inefficient use of resources and postponed delivery. This study views these sectors as a whole from the perspective of a single machine batch-scheduling problem. A dynamic programming algorithm, which aims to search for solutions that entail maximum production efficiency, was developed accordingly with the constraints of changeover costs and production deadlines. We tested the method's ability by processing as many products as possible simultaneously using real data collected from a precast factory in a simulation and compared the effect with a previous study. We found that our method, possesses great potential to improve the efficiency of precast production. (C) 2017 Published by Elsevier B.V.
引用
收藏
页码:34 / 43
页数:10
相关论文
共 14 条
  • [1] Two-agent single-machine scheduling with assignable due dates
    Yin, Yunqiang
    Cheng, Shuenn-Ren
    Cheng, T. C. E.
    Wu, Chin-Chia
    Wu, Wen-Hsiang
    APPLIED MATHEMATICS AND COMPUTATION, 2012, 219 (04) : 1674 - 1685
  • [2] Single-machine batch delivery scheduling with job release dates, due windows and earliness, tardiness, holding and delivery costs
    Ahmadizar, Fardin
    Farhadi, Soma
    COMPUTERS & OPERATIONS RESEARCH, 2015, 53 : 194 - 205
  • [3] Safe scheduling: Setting due dates in single-machine problems
    Baker, Kenneth R.
    Trietsch, Dan
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2009, 196 (01) : 69 - 77
  • [4] Single-machine common due-date scheduling with batch delivery costs and resource-dependent processing times
    Yin, Yunqiang
    Cheng, T. C. E.
    Wu, Chin-Chia
    Cheng, Shuenn-Ren
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (17) : 5083 - 5099
  • [5] Single-machine batch delivery scheduling with an assignable common due window
    Yin, Yunqiang
    Cheng, T. C. E.
    Hsu, Chou-Jung
    Wu, Chin-Chia
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2013, 41 (02): : 216 - 225
  • [6] PROCESSING-PLUS-WAIT DUE-DATES IN SINGLE-MACHINE SCHEDULING
    KAHLBACHER, HG
    CHENG, TCE
    JOURNAL OF OPTIMIZATION THEORY AND APPLICATIONS, 1995, 85 (01) : 163 - 186
  • [7] Stochastic Single Machine JIT Scheduling with Geometric Processing Times and Due Dates
    Luo, Yuncheng
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2021, 2021
  • [8] Single-machine batch delivery scheduling with an assignable common due date and controllable processing times
    Yin, Yunqiang
    Cheng, T. C. E.
    Cheng, Shuenn-Ren
    Wu, Chin-Chia
    COMPUTERS & INDUSTRIAL ENGINEERING, 2013, 65 (04) : 652 - 662
  • [9] Improved estimation of distribution algorithm for the problem of single-machine scheduling with deteriorating jobs and different due dates
    Wu, Hua-Pin
    Huang, Min
    COMPUTATIONAL & APPLIED MATHEMATICS, 2014, 33 (03) : 557 - 573
  • [10] Scheduling a single batch-processing machine with disagreeable ready times and due dates
    Cheraghi, SH
    Vishwaram, V
    Krishnan, KK
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2003, 10 (02): : 175 - 187