AN INTEGRATED MODEL OF PRODUCTION SCHEDULING AND MAINTENANCE PLANNING UNDER IMPERFECT PREVENTIVE MAINTENANCE

被引:14
|
作者
Chen, Xiaohui [1 ]
Xiao, Lei [1 ]
Zhang, Xinghui [2 ]
Xiao, Weixiao [1 ]
Li, Junxing [1 ]
机构
[1] Chongqing Univ, State Key Lab Mech Transmiss, Chongqing 400030, Peoples R China
[2] Mech Engn Coll, Shijiazhuang 050003, Peoples R China
基金
美国国家科学基金会;
关键词
aperiodic imperfect preventive maintenance; production scheduling; maintenance planning; immune clonal selection algorithm; total profit; SINGLE-MACHINE; POLICIES; SYSTEMS;
D O I
10.17531/ein.2015.1.10
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
For a successful company, machines are always required to work continuously to make more profit in a certain period. However, machines can be unavailable due to the scheduled maintenance activities or unexpected failures. Hence, a model connected production scheduling with maintenance planning for a production line which is composed of multiple machines is developed. Suppose preventive maintenance is imperfect and cannot renew all the machines. Age reduction factor and hazard rate increase factor are introduced to illustrate the imperfect character. Aperiodic preventive maintenance policy is adopted. Replacement as perfect maintenance could restore the machine "as good as new". When and whether to perform replacement is based on a cost-time rate function which is defined to judge whether or not the preventive maintenance is economical. The objective of the joint model is to maximize the total profit which is composed of production value, production cost, maintenance cost (including the preventive maintenance cost and replacement cost), and tardiness cost (which is related to the job sequence and maintenance activities). To optimize the objective, immune clonal selection algorithm is utilized. The proposed model is validated by a numerical example.
引用
收藏
页码:70 / 79
页数:10
相关论文
共 50 条
  • [31] Integrated production maintenance and quality model for imperfect processes
    Ben-Daya, M.
    IIE Transactions (Institute of Industrial Engineers), 1999, 31 (06): : 491 - 501
  • [32] Integrated production maintenance and quality model for imperfect processes
    Ben-Daya, M
    IIE TRANSACTIONS, 1999, 31 (06) : 491 - 501
  • [33] A branch and bound algorithm for single-machine production scheduling integrated with preventive maintenance planning
    Wang, Shijin
    Liu, Ming
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (03) : 847 - 868
  • [34] Imperfect Preventive Maintenance Scheduling with Partial Outsourcing Option Considering Production Constraint
    Lin, Danping
    Ji, Minxin
    Li, Haoran
    2021 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEE IEEM21), 2021, : 969 - 973
  • [35] Integrated optimization on train scheduling and preventive maintenance time slots planning
    Luan, Xiaojie
    Miao, Jianrui
    Meng, Lingyun
    Corman, Francesco
    Lodewijks, Gabriel
    TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES, 2017, 80 : 329 - 359
  • [36] Optimal maintenance period and maintenance sequence planning under imperfect maintenance
    Zhang, Xiaoqiang
    Jiang, Hao
    Zheng, Bo
    Li, Zhoushuo
    Gao, Huiying
    QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2023, 39 (05) : 1548 - 1558
  • [37] INTEGRATED PRODUCTION MAINTENANCE MODEL UNDER IMPERFECT AGE-BASED MAINTENANCE POLICY AND NON-NEGLIGIBLE MAINTENANCE TIMES
    El-Ferik, Sami
    Ben-Daya, Mohammed
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2010, 27 (04) : 539 - 558
  • [38] Integrated model of preventive maintenance, quality control and buffer sizing for unreliable and imperfect production systems
    Radhoui, M.
    Rezg, N.
    Chelbi, A.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2009, 47 (02) : 389 - 402
  • [39] Scheduling Preventive Maintenance as a Function of an Imperfect Inspection Interval
    He, Kai
    Maillart, Lisa M.
    Prokopyev, Oleg A.
    IEEE TRANSACTIONS ON RELIABILITY, 2015, 64 (03) : 983 - 997
  • [40] Research of an integrated decision model for production scheduling and maintenance planning with economic objective
    Ao, Yinhui
    Zhang, Huiping
    Wang, Cuifen
    COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 137