Computing Completion Time and Optimal Scheduling of Design Activities in Concurrent Product Development Process

被引:21
作者
Yan, Hong-Sen [1 ,2 ]
Wang, Bin [1 ,2 ]
Xu, Duo [1 ,2 ]
Wang, Zheng [1 ,2 ]
机构
[1] Southeast Univ, Minist Educ, Key Lab Measurement & Control Complex Syst Engn, Nanjing 210096, Peoples R China
[2] Southeast Univ, Sch Automat, Nanjing 210096, Peoples R China
来源
IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART A-SYSTEMS AND HUMANS | 2010年 / 40卷 / 01期
基金
中国国家自然科学基金;
关键词
Concurrent design; design structure matrix (DSM); iteration; optimization method; overlapping; time model; ENGINEERING DESIGN; SYSTEM; MODEL; COST; OPTIMIZATION; MANAGEMENT; ITERATION; KNOWLEDGE; FRAMEWORK; RISK;
D O I
10.1109/TSMCA.2009.2030417
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
This paper proposes a time-computing model and a scheduling method for shortening the completion time of product development under the given rework cost budget. As overlapping and iteration exist between or among design activities in concurrent product development, predictability and efficiency of the process deserve attention. By using the corresponding design structure matrix, the characteristics of information flow are obtained and applied to analysis of the dynamic behavior of the product development process. A time-computing model is set up to estimate the rework cost and completion time of each of the activities, between which both iteration and overlapping are observed. Through sequential quadratic programming, an optimization algorithm is developed for minimizing the development completion time under the constraint of the given rework cost budget. Our application results acquired from our experiments have verified the feasibility and validity of the approach.
引用
收藏
页码:76 / 89
页数:14
相关论文
共 48 条
[1]   Structuring product development processes [J].
Ahmadi, R ;
Roemer, TA ;
Wang, RH .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2001, 130 (03) :539-558
[2]   IS CONCURRENT ENGINEERING ALWAYS A SENSIBLE PROPOSITION [J].
AITSAHLIA, F ;
JOHNSON, E ;
WILL, P .
IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 1995, 42 (02) :166-170
[3]   NEW ALGORITHM FOR STATISTICAL CIRCUIT-DESIGN BASED ON QUASI-NEWTON METHODS AND FUNCTION SPLITTING [J].
BRAYTON, RK ;
DIRECTOR, SW ;
HACHTEL, GD ;
VIDIGAL, LM .
IEEE TRANSACTIONS ON CIRCUITS AND SYSTEMS, 1979, 26 (09) :784-794
[4]  
Browning T, 1998, THESIS MIT CAMBRIDGE
[5]   Modeling impacts of process architecture on cost and schedule risk in product development [J].
Browning, TR ;
Eppinger, SD .
IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2002, 49 (04) :428-442
[6]  
CARRASCOSA M, 1998, P ASME DES ENG TECH
[7]   Overlapping design and build cycles in product development [J].
Chakravarty, AK .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2001, 134 (02) :392-424
[8]   Concurrent design of machined products: A multivariate decision approach [J].
Changchien, SW ;
Lin, L .
IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART C-APPLICATIONS AND REVIEWS, 2000, 30 (02) :252-264
[9]   Decomposition of interdependent task group for concurrent engineering [J].
Chen, SJ ;
Li, L .
COMPUTERS & INDUSTRIAL ENGINEERING, 2003, 44 (03) :435-459
[10]   Availability modeling and cost optimization for the grid resource management system [J].
Dai, Yuan-Shun ;
Xie, Min ;
Poh, Kim-Leng .
IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART A-SYSTEMS AND HUMANS, 2008, 38 (01) :170-179