SIMULATION-BASED OPTIMIZATION FOR INTEGRATED PRODUCTION PLANNING AND CAPACITY EXPANSION DECISIONS

被引:0
作者
Ziarnetzky, Timm [1 ]
Moench, Lars [1 ]
机构
[1] Univ Hagen, Dept Math & Comp Sci, Univ Str 1, D-58097 Hagen, Germany
来源
2016 WINTER SIMULATION CONFERENCE (WSC) | 2016年
关键词
D O I
暂无
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
In this paper, we consider a simplified semiconductor supply chain that consists of a single front-end facility and back-end facility. We present a production planning formulation that is based on clearing functions. A cost-based objective function is considered. The minimum utilization of expensive bottleneck machines in the front-end facility is a parameter of the model. At the same time, the less expensive capacity of the back-end facility can be increased to reduce the cycle time in the backend facility. The release schedules obtained from the planning formulations are assessed using discrete-event simulation. An overall cycle time larger than a given maximum value is penalized. Simulated annealing is used to determine appropriate minimum utilization levels for the front-end bottleneck machines and appropriate capacity expansion levels for the back-end. The results of the computational experiments demonstrate that the profit can be increased while the maximum possible overall cycle time is not violated.
引用
收藏
页码:2992 / 3003
页数:12
相关论文
共 19 条
[1]   Production Planning with Resources Subject to Congestion [J].
Asmundsson, Jakob ;
Rardin, Ronald L. ;
Turkseven, Can Hulusi ;
Uzsoy, Reba .
NAVAL RESEARCH LOGISTICS, 2009, 56 (02) :142-157
[2]  
Back-end, 2016, BACK MOD
[3]   Robust capacity planning in semiconductor manufacturing [J].
Barahona, F ;
Bermon, S ;
Günlük, O ;
Hood, S .
NAVAL RESEARCH LOGISTICS, 2005, 52 (05) :459-468
[4]   An optimization approach to capacity expansion in semiconductor manufacturing facilities [J].
Bard, JF ;
Srinivasan, K ;
Tirupati, D .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1999, 37 (15) :3359-3382
[5]   Modelling and analysis of semiconductor manufacturing in a shrinking world: challenges and successes [J].
Chien, Chen-Fu ;
Dauzere-Peres, Stephane ;
Ehm, Hans ;
Fowler, John W. ;
Jiang, Zhibin ;
Krishnaswamy, Shekar ;
Lee, Tae-Eog ;
Moench, Lars ;
Uzsoy, Reha .
EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2011, 5 (03) :254-271
[6]   IBM solves a mixed-integer program to optimize its semiconductor supply chain [J].
Denton, Brian T. | ;
Forrest, John ;
Milne, R. John .
INTERFACES, 2006, 36 (05) :386-399
[7]  
Ehm H, 2011, WINT SIMUL C PROC, P2119, DOI 10.1109/WSC.2011.6147925
[8]   Simulation-based optimization methods for setting production planning parameters [J].
Gansterer, Margaretha ;
Almeder, Christian ;
Hartl, Richard F. .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2014, 151 :206-213
[9]  
Hopp WJ, 2002, IIE TRANS, V34, P119, DOI 10.1023/A:1011987712718
[10]   Modeling Cycle Times in Production Planning Models for Wafer Fabrication [J].
Kacar, Necip Baris ;
Monch, Lars ;
Uzsoy, Reha .
IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2016, 29 (02) :153-167